Research Highlights

ON-SITE CALIBRATION OF FLOWMETERS AT AJMER, RAJASTHAN FOR M/S NS INSTRUMENTS AND CONTROLS, NEW DELHI
Download
DESK STUDIES FOR THE DESIGN OF COASTAL PROTECTION MEASURE FOR FISHERMAN COLONY NEAR SHIVSHASTRI NAGAR AT CUFF PARADE, COLABA, MUMBAI, MAHARASHTRA
Download
PARALLEL SEISMIC TEST AT UPSTREAM AND DOWNSTREAM SECANT PILES OF SUNDILLA BARRAGE OF KALESWARAM LIFT IRRIGATION SCHEME (KLIS), TELANGANA
Download
HYDRODYNAMICS AND OPTIMIZATION OF DREDGED DISPOSAL LOCATION FOR THE PROPOSED PORT AT MACHILIPATNAM, KRISHNA DISTRICT, ANDHRA PRADESH
Download
SITE INSPECTION OF EARTHEN DAMS OF RELAMPADU AND MUCHONIPALLY BALANCING RESERVOIRS, TELANGANA
Download
PHYSICAL MODEL STUDIES FOR STUDYING WAVE TRANQUILLITY ASPECTS INSIDE HARBOUR BASIN FOR DEVELOPMENT OF EASTERN BREAKWATER AND JETTY AT PORBANDAR, GUJARAT
Download
DESK STUDIES FOR DESIGN OF COASTAL PROTECTION WORK AT VILLAGES UMARASADI, MACHHIWAAD, AND KOLAK, TAL. PARDI, DIST. VALSAD, GUJARAT
Download
DESK STUDIES FOR DESIGN OF COASTAL PROTECTION WORKS AT HAJI ALI DARGAH, WORLI AND GEETANAGAR, MUMBAI
Download
PHYSICAL MODEL STUDIES FOR PROPOSED BARRAGE ACROSS RIVER TAPI IN RUNDH - BHATHA, SURAT, GUJARAT
Download

The hydrological re-assessment involves evaluating water flow and flood risks for the 198 km new railway line project from Indore to Budhni in Madhya Pradesh, aimed at enhancing rail connectivity under the National Infrastructure Pipeline.
Download
Geotechnical analysis to recommend measures for reducing seepage and enhancing stability of the Telewadi earthen dam, addressing safety concerns through soil and foundation assessments.
Download
Geophysical surveys using seismic tomography and electrical resistivity to identify and map weak or distressed areas in the Kalwande Dam structure for targeted repairs.
Download
Numerical modeling to assess structural integrity and safety of the pump house at the tailing dam of NMDC's iron ore beneficiation plant in Bacheli, Chhattisgarh.
Download
In-situ permeability testing to evaluate foundation seepage risks and propose mitigation strategies for the Kadaknathwadi storage tank in Dharashiv district.
Download
Mathematical modeling using HEC-RAS to determine hydraulic parameters for designing effective flood protection walls along the Tapi River in Surat to mitigate urban flooding.
Download
Desk-based analysis for planning coastal protection structures at Dabhari Beach to prevent erosion and support tourism and industrial development in the Olpad taluka area.
Download
Geotechnical evaluation to propose seepage control and stability enhancements for the Nive earthen dam, ensuring long-term safety through soil mechanics analysis.
Download
Dam Instrumentation division is engaged in carrying out studies related to dam safety by providing consultancy towards advanced monitoring and assessment techniques ensuring the structural integrity and operational efficiency of the dams.
Dam instrumentation division at CWPRS has been instrumental in enhancing the safety and longevity of dams through tailored and cutting-edge monitoring solutions and expert consultancy.
Core Functions and Areas of Specialization:
- Functionality Assessment: Dam Instrumentation division offers comprehensive functionality assessment of existing instrumentation in the dams to identify the potential areas for improvement, upgradation and maintenance and also, suggesting the specific strategies for those areas.
- Regulatory Compliance: To ensure that dam operations adhere to national and international safety standards, providing guidance on best practices and regulatory requirements.
- Sensor Installation: The division, also, provides consultancy towards selection and installation of various sensors to monitor parameters such as water pressure, structural movement, seepage, etc. These sensors provide real-time data critical for the early detection of potential issues.
As an ever-evolving approach with rapidly advancing technologies and modern requirements, the dam instrumentation division, is expanding its area of expertise for providing consultancy and services in the fields of Effective Data collection and remote monitoring solutions.
Significant Contributions:
- Provided consultancy towards installation of more than 260 instruments at various levels and chainages at Indira Sagar dam project.
- Revived the existing and nonfunctional instrumentation for hydraulic pore pressure measurements at various dam sites.
FACILITIES
Serial No. | Name of the Project | State |
---|---|---|
1. | Revival of TTPS at Morbe Dam, Tal.Khalapur Dist-Raigad (NMMC) | Maharashtra |
2. | Revival of TTPs at Sukhi Dam, Govt of Gujarat, Bodeli, Gujarat | Gujarat |
3. | Framing of TOR towards Development and Implementation of Web based real time Dam Instrumentation and Structural Health monitoring(WBRTD & WBRTSHM) for Indira Sagar Power Station (ISPS) and Omkareshwar Power station (OSPS), NHDC. | Madhya Pradesh |
4. | Revamping of Instrumentation (TTPs) of Dharoi Dam, Gujarat. | Gujarat |
5. | Field visit towards assessment of dam instruments of various dams at Sharavathy & Varahi HEP, KPCL, Karnataka. | Karnataka |
6. | Revamping of Instrumentation (TTPs) of Ukai Dam, Gujarat. | Gujarat |
- Kamalasekaran P. D., Singh J.K., Bist M.S. and Sonawane A., "Revival of Dam Instrumentation (TTP) of Ukai Dam, Gujarat, ISH Journal of Hydraulic Engineering, 2018.
- Kamalasekaran P. D. and Ranade S. D., “Revamping of Vibrating Wire Instruments of the Existing DAM”, ICOLD Symposium on Sustainable Development of Dams and River Basins, 24th - 27th February, 2021.
Serial No. | Name | Designation | Email Id | Phone Number |
---|---|---|---|---|
1 | Shri P.D. Kamalasekaran | Scientist-E and HoD | kamalasekaran[dot]pd[at]cwprs[dot]gov[dot]in | 020-24103275 |
2 | Dr. Anup Kumar Singh | Scientist -B | anupsingh[dot]k[at]cwprs[dot]gov[dot]in | 020-24103353 |
3 | Shri Ajay Sonawane | Assistant Research Officer | ajay[dot]sonavane[at]cwprs[dot]gov[dot]in | 020-24103309 |
4 | Shri Shailesh Thonte | Assistant Research Officer | shailesh[dot]thonte[at]cwprs[dot]gov[dot]in | 020-24103319 |
5 | Shri Pandharinath G Raykar | Multi-Tasking Staff | raykar[dot]pg[at]cwprs[dot]gov[dot]in | 020-24103319 |
© Copyright © 2024 - Content owned by Central Water and Power Research Station (CWPRS), Developed, hosted, and maintained by ADG Online Solutions Pvt. Ltd.