1 |
27/2024-25 |
Fixing of safety doors and miscellanous works at substation 2 and 12 CWPRS Pune 24 |
00.00 |
3000.00 |
Publish |
2024-11-21 |
2024-11-28 |
2 |
26/2024-25 |
Landscaping along the road from colony entrance to director bunglow in Residential complex at CWPRS Khadakwasla Pune 24 |
00.00 |
3000.00 |
Publish |
2024-11-21 |
2024-11-28 |
3 |
25/2024-25 |
Painting and replastering of internal and external exposed surfaces of VIP Suits at CWPRS Guest House Pune 24 |
00.00 |
11000.00 |
Publish |
2024-11-06 |
2024-11-18 |
4 |
23/2024-25 |
Upgradation of Vibration Technology laboratory at CWPRS Pune 24 |
00.00 |
61000.00 |
Publish |
2024-11-05 |
2024-11-18 |
5 |
24/2024-25 |
Job work for supply installation commissioning and testing for expansion of network connectivity with optical fiber cable from main Building to New CT Building at CWPRS Pune 24 |
00.00 |
9000.00 |
Publish |
2024-11-05 |
2024-11-18 |
6 |
18/2024-25 |
Renovation of room no 107 and 112 in CERC Building CWPRS Pune 24 |
00.00 |
6000.00 |
Publish |
2024-10-25 |
2024-11-07 |
7 |
20/2024-25 |
Renovation work of Departmental Canteen I at CWPRS Pune 24 |
00.00 |
110 00.00 |
Publish |
2024-10-25 |
2024-11-11 |
8 |
21/2024-25 |
Providing G I chain link fencing around the CGHS Wellness Centre at CWPRS Residential Complex Pune 24 |
00.00 |
12000.00 |
Publish |
2024-10-25 |
2024-11-11 |
9 |
22/2024-25 |
Painting of various quarters of B D and E Type at CWPRS Residential Complex Pune 24 |
00.00 |
6000.00 |
Publish |
2024-10-25 |
2024-11-11 |
10 |
19/2024-25 |
Conversion of Transmission OT Line into Underground Transmission UT Cable and SITC of feeder pillars at CWPRS staff colony Pune 24 |
00.00 |
40000.00 |
Publish |
2024-10-25 |
2024-11-07 |
11 |
15/2024-25 |
Cleaning of overhead tanks and elevated storage tank in CWPRS Residential Complex Pune 24 during 2024 25 |
00.00 |
11000.00 |
Publish |
2024-10-18 |
2024-11-04 |
12 |
16/2024-25 |
Jungle cleaning along the internal roads side drains and surrounding the buildings of CWPRS Residential complex Pune 24 during 2024 25 |
00.00 |
6000.00 |
Publish |
2024-10-18 |
2024-11-04 |
13 |
17/2024-25 |
Minor repair works at Transport Office and AEE Civil office at CWPRS Pune 24 during year 2024 25 |
00.00 |
11000.00 |
Publish |
2024-10-18 |
2024-11-04 |
14 |
14/2024-25 |
Reconditioning and Integration of Electronics Display Board with Weather Data at CWPRS Pune 24 |
00.00 |
6000.00 |
Publish |
2024-10-14 |
2024-11-04 |
15 |
13/2024-25 |
Construction of physical wave model for studying wave tranquility aspects inside harbour basin for development of eastern breakwater and jetty at Porbandar Gujarat in MPWB Hangar CWPRS Pune 24 |
00.00 |
25000.00 |
Publish |
2024-10-10 |
2024-10-21 |
16 |
11/2024-25 |
Revival of existing mobile bed composite model to a scale of H 1 500 V 1 70 of Farakka Barrage Model near compartment no VI at CWPRS Pune |
00.00 |
110000.00 |
Publish |
2024-09-27 |
2024-10-08 |
17 |
12/2024-25 |
Construction of Physical model for Reservoir Sedimentation of Ratle Hydroelectric Project at 1 100 scale at HAPT Division CWPRS Pune |
00.00 |
47000.00 |
Publish |
2024-09-27 |
2024-10-08 |
18 |
08/2024-25 |
Providing and fixing demonstration board at Varsha port model and name board at various locations in PHI Division at CWPRS Pune 24 |
00.00 |
6000.00 |
Publish |
2024-09-13 |
2024-09-26 |
19 |
09/2024-25 |
Annual contract for cleaning of garbage dust bins at CWPRS residential complex Pune 24 during 2024 25 |
00.00 |
7000.00 |
Publish |
2024-09-13 |
2024-09-26 |
20 |
10/2024-25 |
Construction of 2 D Sectional Flume for Lower Penganga Model at SED Division at CWPRS Pune 24 |
00.00 |
33000.00 |
Publish |
2024-09-13 |
2024-09-26 |
21 |
06/2024-25 |
Development and Beautification of surroundings of Kalpasar Hangar along with minor civil works at CWPRS Pune 24 |
00.00 |
33000.00 |
Publish |
2024-09-09 |
2024-09-19 |
22 |
07/2024-25 |
Renovation of existing physical wave model of Pradip port for proposed studies at coastal data center CWPRS Pune 24 |
00.00 |
54000.00 |
Publish |
2024-09-09 |
2024-09-19 |
23 |
05/2024-25 |
Renovation of the existing shed of tilting flume for sedimentation studies for Pakal Dul and Ratle H E at CWPRS Pune 24 |
00.00 |
35000.00 |
Publish |
2024-09-09 |
2024-09-19 |
24 |
GEM/2024/B/5200461 |
Ordinary Portland Cement 43 Grade or 43 S Grade for Bulk Buying V2 as per IS 269 Q3 |
0.00 |
26000.00 |
Publish |
2024-07-24 |
2024-08-07 |
25 |
03/2024-25 |
Fabrication Supply Installation and Commissioning of Non Contact Wireless Water Wave Height Data Acquisition System for Paradip Model at CWPRS Pune 24reg |
0.00 |
26000.00 |
Publish |
2024-06-21 |
2024-07-11 |
26 |
04/2024-25 |
Up gradation of Engineering Seismology Laboratoty CWPRS Pune 24 |
0.00 |
34000.00 |
Publish |
2024-06-20 |
2024-07-04 |
27 |
02/2023-24 |
Construction of model tray for 3D Comprehensive Model of Dugar HE Project Himachal Pradesh CWPRS Pune 24 |
0.00 |
39000.00 |
Publish |
2024-05-27 |
2024-06-13 |
28 |
GEM/2024/B/4952431 |
Hiring of Boats Survey Boat Less than 7 years Without Air Conditioning 7 10 Persons 1000 Outboard Steel Foot pump Paddles Repair kit Rescue Life Jackets Lifebuoys 12 Volt Heavy Duty Battery Fire Extinguisher Service Provider |
0.00 |
0.00 |
Publish |
2024-05-24 |
2024-05-24 |
29 |
01/2024-25 |
Water proofing of bed in wave flume in RWFF Hanger near CERC building CWPRS Pune 24 |
0.00 |
38000.00 |
Publish |
2024-05-16 |
2024-06-06 |
30 |
GEM/2024/B/4866725 |
Ultrasonic Pulse Velocity Tester 02 unit along with accessories |
0.00 |
90000.00 |
Publish |
2024-05-13 |
2024-06-12 |
31 |
GEM/2024/B/4738143 |
Procurement of Modular Work Stations V2 Q3 Meeting Table V2 Q3 Revolving Chair V3 Q2 |
0.00 |
0.00 |
Publish |
2024-03-18 |
2024-03-18 |
32 |
50/2023-24 |
Repairing and Servicing of rolling shutters of Mumbai and New Mangalore Port Model at CWPRS Pune 24 |
0.00 |
3000.00 |
Publish |
2023-12-22 |
2024-01-08 |
33 |
51/2023-24 |
Desilting of return channel including provision of silt chambers of 120 cusec water recirculation system etc at CWPRS Pune 24 |
0.00 |
20000.00 |
Publish |
2023-12-22 |
2024-01-08 |
34 |
52/2023-24 |
Designing fabricating installing and fixing of structural glazing and aluminium composite panel for DOHI Building CWPRS Pune 24 |
0.00 |
29000.00 |
Publish |
2023-12-22 |
2024-01-08 |
35 |
49/2023-24 |
Lab stetup for AWS Lab Civil Work Construction of Cabins cubicals painting etc Under NHP at CWPRS kdk Pune 24 |
0.00 |
21000.00 |
Publish |
2023-12-20 |
2024-01-08 |
36 |
46/2023-24 |
Supply Installation Testing and Commissioning of Transformer VFD DAS Control Panel and Cable Laying for Pump Test Lab in HMC Division under NHP at CWPRS Pune 24 |
0.00 |
156000.00 |
Publish |
2023-12-19 |
2024-01-19 |
37 |
47/2023-24 |
Development of Sports Track Skating Rink in residential complex at CWPRS Pune24 |
0.00 |
16000.00 |
Publish |
2023-12-19 |
2024-01-03 |
38 |
48/2023-24 |
Renovation of Old Parking Shed left side of OCL building in CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-12-19 |
2024-01-03 |
39 |
GEM/2023/B/4233184 |
Hiring of Boats Survey Boat Less than 10 years Without Air Conditioning 4 to 6 Persons 100 Inboard Wood Repair kit Rescue Life Jackets Lifebuoys 12 Volt Heavy Duty Battery Genset 2KW Fire Extinguisher First Aid Box Safety Hand Lamp Serv |
0.00 |
24000.00 |
Publish |
2023-12-05 |
2023-12-05 |
40 |
GEM/2023/B/4244844 |
Custom Bid for Services Hiring of various type of vehicles for CWPRS |
0.00 |
100000.00 |
Publish |
2023-12-04 |
2023-12-04 |
41 |
GEM/2023/B/4236628 |
Custom Bid for Services Hiring of car bus vehicles on call basis |
0.00 |
0.00 |
Publish |
2023-12-01 |
2023-12-01 |
42 |
45/2023-24 |
Providing and Fixing MS Rolling Shutters for Storage Rooms of INCHOE Hall at CWPRS Pune 24 |
0.00 |
3000.00 |
Publish |
2023-11-29 |
2023-12-14 |
43 |
44/2023-24 |
Renovation of TC division in DOHI building at CWPRS Pune 24 |
0.00 |
52000.00 |
Publish |
2023-11-24 |
2023-12-11 |
44 |
43/2023-24 |
Provision of approach road boundary wall and miscellaneous civil works for IP Lab under NHP in CWPRS Pune 24 |
0.00 |
31000.00 |
Publish |
2023-11-24 |
2023-12-11 |
45 |
29R/2023-24 |
Upgradation of Various Electrical Installations under NHP Supply Installation Commissioning and Testing of Substation Automation and Energy Management Systems at 14 substations at CWPRS Pune 24 |
0.00 |
130000.00 |
Publish |
2023-11-22 |
2023-12-15 |
46 |
41/2023-24 |
Provision for Control Cabin and Data Handling Room with rakes and furniture for substation Automation System under NHP CWPRS Pune 24 |
0.00 |
31000.00 |
Publish |
2023-11-16 |
2023-12-04 |
47 |
39/2023-24 |
Construction of New RCC Boundary Wall surrounding CWPRS office premises at CWPRS Khadakwasla Pune24 |
0.00 |
48000.00 |
Publish |
2023-11-09 |
2023-11-28 |
48 |
38/2023-24 |
Construction of Model Tray for 1 70 scale 3D Comprehensive model for Spillway of Ratle HE Project JK at SED Division CWPRS Pune 24 |
0.00 |
2824898.00 |
Publish |
2023-11-09 |
2023-11-28 |
49 |
GEM/2023/B/4157909 |
Office Suite Software V2 Q2 PAC Only |
0.00 |
19822.00 |
Publish |
2023-11-06 |
2023-11-22 |
50 |
GEM/2023/B/4157141 |
Insulation Quality Analyzer for HT cables RMU Transformers Q3 |
0.00 |
28000.00 |
Publish |
2023-11-01 |
2023-11-24 |
51 |
GEM/2023/B/4133443 |
Forklifts V2 as per IS 6765 2003 and IS 10517 Q2 |
0.00 |
29800.00 |
Publish |
2023-11-01 |
2023-12-08 |
52 |
37/2023-24 |
Construction of RCC Jacketing for 120 Cusec Escape Channel near MPWB Hanger at CWPRS Pune 24 |
0.00 |
40000.00 |
Publish |
2023-10-27 |
2023-11-20 |
53 |
GEM/2023/B/4016251 |
Procurement of Workstation Q3 |
0.00 |
88000.00 |
Publish |
2023-10-25 |
2023-10-25 |
54 |
36/2023-24 |
Construction of Inlet Tank and Shed Extension for model studies of Ghatti Basavanna Dam Karnataka at CS and WCS Division at CWPRS Pune24 |
0.00 |
43000.00 |
Publish |
2023-10-18 |
2023-11-02 |
55 |
30R/2023-24 |
Up gradation of Various Electrical Installations Supply Installation Testing and Commissioning of Stand alone Solar PV Systems and Water Heating Systems under NHP at CWPRS Office and CWPRS Staff Colony Pune 24 |
0.00 |
41000.00 |
Publish |
2023-10-17 |
2023-11-27 |
56 |
34/2023-24 |
Procurement of Hand Held Surface Velocity Gun under NHP at CWPRS Pune 24 |
0.00 |
11000.00 |
Publish |
2023-10-12 |
2023-10-30 |
57 |
35/2023-24 |
Procurement of Hand Held Surface Velocity Gun under NHP at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-10-12 |
2023-11-10 |
58 |
31/2023-24 |
Construction of Parking Shed and Approach Road for wave flume hanger at CHS II division at CWPRS Pune 24 |
0.00 |
19000.00 |
Publish |
2023-10-06 |
2023-10-25 |
59 |
32/2023-24 |
Repairs to Compound wall at various location of CWPRS Residential Complex Pune 24 |
0.00 |
26000.00 |
Publish |
2023-10-06 |
2023-10-25 |
60 |
33/2023-24 |
Supply Installation Testing and Commissioning of Dielectric Test Systems for IP Acceptance Testing High Voltage AC DC Impulse Test Systems with Accessories under NHP at CWPRS Pune 24 |
0.00 |
63000.00 |
Publish |
2023-10-06 |
2023-11-03 |
61 |
27/2023-24 |
Casting of RCC Mooring Anchor Blocks for deployment of CMIS Instruments in MMCE PHII Division at CWPRS Pune 24 |
0.00 |
2000.00 |
Publish |
2023-09-21 |
2023-10-11 |
62 |
28/2023-24 |
Up gradation of Various Electrical Installation of CWPRS Supply installation commissioning and testing of Concealed Substations RMU and High Tension HT cable at Substation No3 6 10 and 14 at CWPRS |
0.00 |
76000.00 |
Publish |
2023-09-21 |
2023-10-20 |
63 |
29/2023-24 |
Up gradation of Various Electrical Installation of CWPRS Supply Installation Commissioning and Testing of Substation Automation and Energy Management Systems at 14 substations of CWPRS |
0.00 |
130000.00 |
Publish |
2023-09-21 |
2023-10-20 |
64 |
26/2023-24 |
Minor Civil works in PH I division at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-09-15 |
2023-10-03 |
65 |
25/2023-24 |
Fabrication and Installation of model parts for 2D Spillway model for Kalpsar Dam Spillway Gujarat at SED Division at CWPRS Pune 24 |
0.00 |
33000.00 |
Publish |
2023-09-12 |
2023-09-25 |
66 |
24/2023-24 |
Providing Services for Mosquito control in CWPRS Residential Complex Pune 24 during 2023 24 |
0.00 |
6000.00 |
Publish |
2023-09-08 |
2023-09-20 |
67 |
23/2023-24 |
Procurement of Automatic Water Level Logger Multi Parameter Probe at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-09-04 |
2023-09-28 |
68 |
21/2023-24 |
Special Repair works Phase wise of staff quarters B Type Phase III 06 Nos at CWPRS Residential Complex Pune 24 |
0.00 |
41000.00 |
Publish |
2023-08-31 |
2023-09-21 |
69 |
22/2023-24 |
Providing MS fabrication in office windows and renovation of mens toilet in SED Division at CWPRS Pune 24 |
0.00 |
11000.00 |
Publish |
2023-08-31 |
2023-09-20 |
70 |
18/2023-24 |
Providing fixing commissioning and testing of ISI marked new sluice valve of 600 mm NB PE80 and PN 10 of approved make at 120 cusecs Pump House Division at CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2023-08-29 |
2023-09-11 |
71 |
19/2023-24 |
SITC of Van Veen Grab Sampler Qty 2Nos for the implementation of Coastal Management Information System under CMIS at Satpati near Palghar Maharashtra and NaniDanti MotiDanti Near Valsad Gujarat for CWPRS Pun |
0.00 |
4000.00 |
Publish |
2023-08-29 |
2023-09-14 |
72 |
20/2023-24 |
Special repair works phase wise of staff quarters C type Phase III 6 Nos at CWPRS Residential Complex Pune 24 |
0.00 |
47000.00 |
Publish |
2023-08-29 |
2023-09-14 |
73 |
GEM/2023/B/3881464 |
Security Manpower Service Version 2 Office Commercial Institutions Residential Security Supervisor Security Manpower Service Version 2 Office commercial Institutions Residential Unarmed Security Guard |
0.00 |
1360000.00 |
Publish |
2023-08-28 |
2023-09-18 |
74 |
GEM/2023/B/3882546 |
Bus Hiring Service Short Term Local 19 21 Non Deluxe NDX 50 |
0.00 |
0.00 |
Publish |
2023-08-28 |
2023-08-31 |
75 |
17/2023-24 |
Jungle cleaning along the internal roads side drains and surrounding the buildings of CWPRS Residential complex Pune 24 during 2023 24 |
0.00 |
14000.00 |
Publish |
2023-08-25 |
2023-09-11 |
76 |
16/2023-24 |
Cleaning of septic tank chocked sewer line overhead tank and elevated storage tank at CWPRS office and Residential Complex Pune 24 during 2023 24 |
0.00 |
18000.00 |
Publish |
2023-08-21 |
2023-09-06 |
77 |
GEM/2023/B/3854079 |
Local Chemist Empanelment Service |
0.00 |
0.00 |
Publish |
2023-08-21 |
2023-09-04 |
78 |
GEM/2023/B/3817156 |
Digital Water Level Measuring Gauge Q3 |
0.00 |
40000.00 |
Publish |
2023-08-21 |
2023-09-20 |
79 |
GEM/2023/B/3811558 |
Operation And Maintenance Of Lifts Elevators Complete System |
0.00 |
0.00 |
Publish |
2023-08-11 |
2023-09-01 |
80 |
GEM/2023/B/3656291 |
Procurement of Chemicals and Glassware |
0.00 |
0.00 |
Publish |
2023-08-05 |
2023-08-05 |
81 |
15/2023-24 |
Maintenance and Repair at various quarters of B D and E Type quarters to be allot in 2023 24 and already allotted at CWPRS Residential Complex Pune 24 |
0.00 |
20000.00 |
Publish |
2023-08-04 |
2023-08-21 |
82 |
14/2023-24 |
Cleaning and Sweeping of Toilet Blocks in CWPRS Campus at Khadakwasla Pune during 2023 24 |
0.00 |
41000.00 |
Publish |
2023-07-27 |
2023-08-10 |
83 |
GEM/2023/B/3715625 |
Procurement of AUDIO VIDEO CONFERENCING FACILITY along with All Accessories for CWPRS Qty 2Nos Q3 |
0.00 |
22316.00 |
Publish |
2023-07-25 |
2023-08-26 |
84 |
GEM/2023/B/3650334 |
Workstations Q3 |
0.00 |
30000.00 |
Publish |
2023-07-14 |
2023-07-26 |
85 |
GEM/2023/B/3650334 |
Workstations Q3 |
0.00 |
30000.00 |
Publish |
2023-07-14 |
2023-07-26 |
86 |
GEM/2023/B/3687819 |
Workstation with Monitor Q3 |
0.00 |
60000.00 |
Publish |
2023-07-13 |
2023-08-03 |
87 |
GEM/2023/B/3687819 |
Workstation with Monitor Q3 |
0.00 |
60000.00 |
Publish |
2023-07-13 |
2023-08-03 |
88 |
GEM/2023/B/3656291 |
Chemicals and Glassware NHP Q3 |
0.00 |
0.00 |
Publish |
2023-07-06 |
2023-08-05 |
89 |
12/2023-24 |
Minor Civil Works at AWS Lab under NHP at CWPRS Pune 24 |
0.00 |
4000.00 |
Publish |
2023-07-04 |
2023-07-24 |
90 |
11/2023-24 |
Lab setup for AWS Lab Electrical Work under NHP at CWPRS Pune 24 |
0.00 |
6000.00 |
Publish |
2023-07-04 |
2023-07-24 |
91 |
GEM/2023/B/3625571 |
Matlab Software and Its Tools Q3 |
0.00 |
18434.00 |
Publish |
2023-06-30 |
2023-07-28 |
92 |
10/2023-24 |
Annual contract for cleaning of Garbage Dust Bins at CWPRS Residential Complex Pune 24 during 2023 24 |
0.00 |
6500.00 |
Publish |
2023-06-27 |
2023-07-11 |
93 |
10/2023-24 |
Annual contract for cleaning of Garbage Dust Bins at CWPRS Residential Complex Pune24 during 202324 |
0.00 |
6500.00 |
Publish |
2023-06-27 |
2023-07-11 |
94 |
08/2023-24 |
Job Work for modification and strengthening arrangement for wave board at multipurpose flume model of Ramayapatnam Gateway Port Greenfield Port Prakasam District AP at CWPRS Pune24 |
0.00 |
1500.00 |
Publish |
2023-06-16 |
2023-06-29 |
95 |
09/2023-24 |
Modification in the Existing 3D Comprehensive Model of Kawar HE Project JK for Scour Studies at CWPRS Pune24 |
0.00 |
6500.00 |
Publish |
2023-06-16 |
2023-06-29 |
96 |
08/2023-24 |
Job Work for modification and strengthening arrangement for wave board at multipurpose flume model of Ramayapatnam Gateway Port Greenfield Port Prakasam District AP at CWPRS Pune 24 |
0.00 |
1300.00 |
Publish |
2023-06-16 |
2023-06-30 |
97 |
09/2023-24 |
Modifications in the Existing 3D Comprehensive Model of Kwar HE Project JK for Scour Studies at CWPRS Pune24 |
0.00 |
6500.00 |
Publish |
2023-06-16 |
2023-06-30 |
98 |
Minor Civil work Including extension of existing roof and providing fly proof door shutter in building at CWPRS Pune 24 |
Minor Civil work Including extension of existing roof and providing fly proof door shutter in building at CWPRS Pune 24 |
0.00 |
1200.00 |
Publish |
2023-05-30 |
2023-06-13 |
99 |
GEM/2023/B/3466357 |
SITC of Outdoor Camera with 2D Velocity Profiling Optical Flow Measurement Radar Velocity Sensor |
0.00 |
60000.00 |
Publish |
2023-05-22 |
2023-07-03 |
100 |
GEM/2023/B/3466357 |
SITC of Outdoor camera 2D velocity profiling and optical flow measurement system with radar velocity sensor |
0.00 |
60000.00 |
Publish |
2023-05-22 |
2023-07-03 |
101 |
Renovation of existing flume shed and development of surroundings in SED Division for 2D Sectional Model of Left Bank Canal Head Regulation of Polavaram irrigation project Andhra Pradesh at CWPRS Pune 24 |
Renovation of existing flume shed and development of surroundings in SED Division for 2D Sectional Model of Left Bank Canal Head Regulation of Polavaram irrigation project Andhra Pradesh at CWPRS Pune 24 |
0.00 |
20000.00 |
Publish |
2023-05-15 |
2023-05-26 |
102 |
04/2023-24 |
Electrical works for Establishment of Structural Analysis and Interpretation centre in SMA division at CWPRS Pune24 |
0.00 |
5000.00 |
Publish |
2023-05-09 |
2023-05-23 |
103 |
03/2023-24 |
Job work of Super cleaning of hydraulic oil up to NAS grade 6 Qty 7350 liters per year at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-05-09 |
2023-06-06 |
104 |
03/2023-24 |
Job work of Super cleaning of hydraulic oil up to NAS grade 6 Qty 7350 liters per year at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2023-05-09 |
2023-06-06 |
105 |
02/2023-24 |
Civil Work Provision of control cabins and miscellaneous work under NHP at CWPRS Pune 24 |
0.00 |
25500.00 |
Publish |
2023-05-08 |
2023-06-12 |
106 |
GEM/2023/B/3302993 |
Procurement of Environmental Chamber TCCF High Range Pressure GW |
0.00 |
70000.00 |
Publish |
2023-05-04 |
2023-05-04 |
107 |
GEM/2023/B/3382740 |
Heave Sensor Q3 |
0.00 |
16000.00 |
Publish |
2023-04-25 |
2023-05-16 |
108 |
01/2023-24 |
Providing fixing Rolling shutter and ridges for IP Laboratory at CWPRS Pune 24 |
0.00 |
2000.00 |
Publish |
2023-04-11 |
2023-04-19 |
109 |
GEM/2023/B/3342539 |
Electromagnetic flowmeter |
0.00 |
20000.00 |
Publish |
2023-04-10 |
2023-05-01 |
110 |
GEM/2023/B/3342539 |
Installation and commissioning of electromagnetic flow meter |
0.00 |
20000.00 |
Publish |
2023-04-10 |
2023-05-01 |
111 |
GEM/2023/B/3302993 |
Environmental Chamber TCCF High Range Pressure GW Q3 |
0.00 |
70000.00 |
Publish |
2023-03-30 |
2023-05-04 |
112 |
GEM/2023/B/3303308 |
Power Quality Analyzers IS 9000 Q3 |
0.00 |
28425.00 |
Publish |
2023-03-28 |
2023-04-13 |
113 |
GEM/2023/B/3299018 |
River Acoustic Doppler Current Profiler ADCP System Q3 |
0.00 |
90000.00 |
Publish |
2023-03-23 |
2023-04-14 |
114 |
GEM/2023/B/3299018 |
River Acoustic Doppler Current Profiler ADCP System Q3 |
0.00 |
90000.00 |
Publish |
2023-03-23 |
2023-04-14 |
115 |
GEM/2023/B/3278940 |
Real Time Kinematic survey systems |
0.00 |
80000.00 |
Publish |
2023-03-21 |
2023-04-17 |
116 |
GEM/2023/B/3278940 |
Real Time Kinematic survey systems |
0.00 |
80000.00 |
Publish |
2023-03-21 |
2023-04-17 |
117 |
GEM/2023/B/3057606 |
Video Camera for cinematography with HDMI cable Q3 |
0.00 |
12000.00 |
Publish |
2023-01-31 |
2023-02-22 |
118 |
GEM/2023/B/3056437 |
DSLR Camera 35 mm with photographic Lenses flash gun Q3 |
0.00 |
23000.00 |
Publish |
2023-01-31 |
2023-02-22 |
119 |
GEM/2023/B/2992848 |
Acoustic Doppler piston type Phased Array multi beam Q3 |
0.00 |
80000.00 |
Publish |
2023-01-16 |
2023-02-07 |
120 |
GEM/2022/B/2822693 |
Annual Maintenance service AIR CONDITIONER |
0.00 |
0.00 |
Publish |
2022-12-07 |
2023-01-06 |
121 |
GEM/2022/B/2816099 |
Custom Bid for Services Custom Bid for Services |
0.00 |
67400.00 |
Publish |
2022-12-05 |
2022-12-19 |
122 |
GEM/2022/B/2803875 |
Borehole Sampler for Water |
0.00 |
6000.00 |
Publish |
2022-12-01 |
2022-12-21 |
123 |
GEM/2022/B/2803875 |
Borehole Sampler for Water |
0.00 |
6000.00 |
Publish |
2022-12-01 |
2022-12-21 |
124 |
GEM/2022/B/2765761 |
Power Generator DG Set Upto 900 KVA Q2 |
0.00 |
7500.00 |
Publish |
2022-11-22 |
2022-12-12 |
125 |
GEM/2021/B/1643330 |
BOQ Q3 Workstation Desktop Computer |
0.00 |
32400.00 |
Publish |
2021-11-02 |
2021-11-20 |
126 |
GEM/2021/B/1643330 |
BOQ Q3 Workstation Desktop Computer |
0.00 |
32400.00 |
Publish |
2021-11-02 |
2021-11-20 |
127 |
17R/2019-20 |
Up gradation of Various Electrical Installation of CWPRS Supply installation commissioning and testing of Ring Main Unit RMU at various Substation under NHP at CWPRS Pune 24 |
0.00 |
152000.00 |
Publish |
2021-09-30 |
2021-10-29 |
128 |
GEM/2021/B/1449306 |
Workstation |
0.00 |
25511.00 |
Publish |
2021-08-19 |
2021-09-03 |
129 |
GEM/2021/B/1449306 |
Workstation |
0.00 |
25511.00 |
Publish |
2021-08-19 |
2021-09-03 |
130 |
GEM/2021/B/1442565 |
Professional Large Format Display |
0.00 |
0.00 |
Publish |
2021-08-16 |
2021-08-26 |
131 |
GEM/2021/B/1442565 |
Professional Large Format Display |
0.00 |
0.00 |
Publish |
2021-08-16 |
2021-08-26 |
132 |
GEM/2021/B/1442565 |
Professional Large Format Display |
0.00 |
0.00 |
Publish |
2021-08-16 |
2021-08-26 |
133 |
92/2020-21 |
Rate Contract for Hiring of Tourist Taxi AC and Non AC for local and outstation Journeys as and When Required Basis for CWPRS Pune 24 |
0.00 |
20000.00 |
Publish |
2021-03-31 |
2021-04-15 |
134 |
80/2020-21 |
Day to Day activities including maintenance and up keeping of TCCF building Ground Water GW Lab and AWS Site under NHP at CW and PRS Pune 24 |
0.00 |
19000.00 |
Publish |
2021-02-01 |
2021-02-12 |
135 |
81/2020-21 |
Extension renovation and furnishing of TCCF Office and Nodal Officer office Civil and Electrical works under NHP at CWPRS Pune 24 |
0.00 |
18000.00 |
Publish |
2021-02-01 |
2021-02-12 |
136 |
68/2020-21 |
Supply Installation Commissioning and Testing of Servo Hydraulic System for Random Sea Wave Generator RSWG for 75m Wave Flume at CWPRS Pune 24 |
0.00 |
318000.00 |
Publish |
2020-12-09 |
2021-01-21 |
137 |
69/2020-21 |
Supply Installation Commissioning and Testing of Servo Hydraulic System for Random Sea Wave Generator RSWG for 120m Wave Flume at CWPRS Pune 24 |
0.00 |
360000.00 |
Publish |
2020-12-09 |
2021-01-21 |
138 |
59/2020-21 |
Supply Installation Testing and Commissioning of MATLAB Software along with Complier at CWPRS Pune |
0.00 |
14000.00 |
Publish |
2020-11-23 |
2020-12-14 |
139 |
60/2020-21 |
Conducting Hydrographic Survey for capacity assessment of Rihand Reservoir Dist Sonbhadra Uttar Pradesh |
0.00 |
64000.00 |
Publish |
2020-11-23 |
2020-12-16 |
140 |
40/2020-21 |
Supply Installation Testing and Commissioning of Portable Core Drilling Machine with Accessories at CWPRS Pune 24 |
0.00 |
24000.00 |
Publish |
2020-10-05 |
2020-11-05 |
141 |
38/2020-21 |
Supply Installation Testing and Commissioning of High Range Radar Water Level Sensor under NHP for CWPRS Pune 24 |
0.00 |
4000.00 |
Publish |
2020-09-25 |
2020-10-20 |
142 |
37/2020-21 |
Supply Installation Testing and Commissioning of Small Current Meter with Digital Counter at CWPRS Pune 24 |
0.00 |
8500.00 |
Publish |
2020-09-23 |
2020-10-21 |
143 |
36/2020-21 |
Replacement of flush door and PVC door shutters in B phase III C and D type quarters of Residential Complex Pune24 |
0.00 |
8000.00 |
Publish |
2020-09-22 |
2020-10-12 |
144 |
35/2020-21 |
Supply Installation Commissioning and testing of LT panel starters and laying of cable at 100 cusec and 120 cusec pump houses at CWPRS Pune24 |
0.00 |
41000.00 |
Publish |
2020-09-22 |
2020-10-12 |
145 |
32/2020-21 |
Supply Installation Testing and Commissioning of Constant Temperature Water Bath at CWPRS Pune 24 |
0.00 |
11000.00 |
Publish |
2020-09-17 |
2020-10-14 |
146 |
33/2020-21 |
Supply Installation Testing and Commissioning of Abrasion Resistance Machine for Concrete by Underwater Method and accessories as per ASTM C 1138 standard at CWPRS Pune 24 |
0.00 |
5000.00 |
Publish |
2020-09-15 |
2020-10-14 |
147 |
34/2020-21 |
Supply Installation Testing and Commissioning of Abrasion Resistance Machine for Concrete by Abrasion Charge Method as per IS 9284 1979 along with Air Compressor at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2020-09-15 |
2020-10-14 |
148 |
29/2020-21 |
Repairs of Compound wall at compartment no1 and 2 of CWPRS office premises at Khadakwalsa Pune24 |
0.00 |
40000.00 |
Publish |
2020-09-15 |
2020-10-05 |
149 |
30/2020-21 |
Supply Installation Testing and Commissioning ofVibration Machine for Casting of Cement Mortar Cubes with MouldingCubes at CWPRS Pune 24 |
0.00 |
2400.00 |
Publish |
2020-09-15 |
2020-10-06 |
150 |
31/2020-21 |
Supply Installation Testing and Commissioning of Equipments for Testing Self Compacting Concrete at CWPRS Pune 24 |
0.00 |
2400.00 |
Publish |
2020-09-15 |
2020-10-06 |
151 |
28/2020-21 |
Construction of Parking shed near OCL building at CWPRS Pune 24 |
0.00 |
60000.00 |
Publish |
2020-09-08 |
2020-09-24 |
152 |
26/2020-21 |
Supply Installation Testing and Commissioning of Cyclic Tri axial Soil Test System at CWPRS Pune |
0.00 |
190000.00 |
Publish |
2020-09-07 |
2020-10-07 |
153 |
27/2020-21 |
Supply Installation Testing and Commissioning of Perpetual Licenses of CFD Software FLOW 3D at CWPRS Pune |
0.00 |
132000.00 |
Publish |
2020-09-07 |
2020-10-08 |
154 |
25/2020-21 |
Supply lnstallation Testing and Commissioning of Fully Automated Table Top Static Tri axial Soil Test System for CWPRS Pune |
0.00 |
200000.00 |
Publish |
2020-09-04 |
2020-10-07 |
155 |
19/2020-21 |
Supply installation testing and commissioning of PORTABLE WELL LOGGING UNIT under DRIP for CWPRS Pune 24 |
0.00 |
500000.00 |
Publish |
2020-08-28 |
2020-10-05 |
156 |
20/2020-21 |
Supply installation testing and commissioning of UV CHAMBER FOR GEOTEXTILES under DRIP for CWPRS Pune 24 |
0.00 |
250000.00 |
Publish |
2020-08-28 |
2020-10-05 |
157 |
21/2020-21 |
Supply installation testing and commissioning of Fully Automated Cyclic Simple Shear Soil Resting Equipment under DRIP for CWPRS Pune 24 |
0.00 |
180000.00 |
Publish |
2020-08-28 |
2020-10-05 |
158 |
22/2020-21 |
Supply lnstallation Testing and Commissioning of Acoustic Doppler Gurrent Profiler ADCP for Discharge Measurement under CMIS at Satpati near Palghar Maharashtra for CWPRS Pune |
0.00 |
73000.00 |
Publish |
2020-08-28 |
2020-09-28 |
159 |
12/2020-21 |
Supply Installation Supply Installation Testing and Commissioning of Full Bore Electro Magnetic Flow Meters at various Iocations of CWPRS Pune 24 |
0.00 |
25000.00 |
Publish |
2020-06-23 |
2020-07-27 |
160 |
10/2020-21 |
Supply lnstallation Testing and Commissioning of Sensor Testing Chamber under NHP for CWPRS Pune 24 |
0.00 |
90000.00 |
Publish |
2020-06-22 |
2020-07-28 |
161 |
91/2019-20 |
Supply lnstallation Testing and Commissioning of Acoustic Doppler Gurrent Profiler ADCP for Marine Environment under CMIS at Satpati near Palghar Maharashtra and NaniDanti MotiDanti Near Valsad Guiarat for CWPRS Pune |
0.00 |
123000.00 |
Publish |
2020-02-03 |
2020-03-03 |
162 |
46A/2019-20 |
Supply installation testing and commissioning of Digital Automatic Computer Controlled Compression Testing Machine of 5000 KN Capacity under DRIP for CWPRS Pune 24 |
0.00 |
100000.00 |
Publish |
2020-01-31 |
2020-03-02 |
163 |
46B/2019-20 |
Supply installation testingrund commissioning of Servo Controlled Hydraulic Testing System of 300 KN Capacity under DRIP for CWPRS Pune 24 |
0.00 |
140000.00 |
Publish |
2020-01-31 |
2020-03-02 |
164 |
53B/2019-20 |
Supply installation testing and commissinning of Ground Penetrating Radar along with Analysis Software including Accessories under DRIP for CWPRS Pune 24 |
0.00 |
60000.00 |
Publish |
2020-01-27 |
2020-02-26 |
165 |
53C/2019-20 |
Supply installation testing and commissioning of Resonance Frequency Test System along with Analysis Software including Accessories under DRIP for CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2020-01-27 |
2020-02-26 |
166 |
53D/2019-20 |
Supply installation testing and commissioning of Portable Ultrasonic NonDestructive Digital lndicating Tester along with Analysis Software including Accessories under DRIP for CWPRE Pune 24 |
0.00 |
20000.00 |
Publish |
2020-01-27 |
2020-02-24 |
167 |
52R/2019-20 |
Supply installation Testing commissioning of VIBRATION MONTTORTNG sysrEMwtTHsrGA At ANAtySrS SOFTWARE INCLUDING ACCESSOR ES under DRIP for CWPRE Pune 24 |
0.00 |
50000.00 |
Publish |
2020-01-24 |
2020-02-24 |
168 |
53A/2019-20 |
Supply installation testing and commissioning of 24 Channel Signal Enhancement Seismograph along with Analysis Softtarare including accessories under DRIP for CWPRS Pune 24 |
0.00 |
50000.00 |
Publish |
2020-01-24 |
2020-02-24 |
169 |
82/2019-20 |
Conducting Sedimentation Survey using Sub Bottom Profiler at Kadana Dam Reservoir Mahisaqar Guiarat |
0.00 |
30000.00 |
Publish |
2019-12-17 |
2020-01-02 |
170 |
81/19-20 |
Conducting Sedimentation Survey at Kadana Dam Reservoir Mahisagar Guiarat |
0.00 |
36800.00 |
Publish |
2019-12-17 |
2020-01-02 |
171 |
83/2019-20 |
Conducting Hydrographic Survey at Storage Reservoir of Ordnance Factory Khamaria Jabalpur Madhya Pradesh |
0.00 |
2800.00 |
Publish |
2019-12-17 |
2020-01-02 |
172 |
79/19-20 |
Supply installation Testing and Commissioning of Pressure based tide gauge under CMIS at Satpati near Palghar Maharashtra and NaniDantiMotiDanti Near Valsad Gujarat for CWPRS Pune |
0.00 |
58000.00 |
Publish |
2019-12-09 |
2020-01-09 |
173 |
73/2019-20 |
Supply Installation Testing and Commissioning of Automatic Weather Stations AWS at Satpati near Palghar Maharashtra and NaniDanti MotiDanti Near Valsad Gujarat |
0.00 |
26000.00 |
Publish |
2019-11-21 |
2019-12-19 |
174 |
63/2019-20 |
Jungle cleaning along the internal roads and surrounding the residential non residential buildings of CWPRS Office premises and residential complex at Khadakwasla Pune |
0.00 |
14000.00 |
Publish |
2019-10-25 |
2019-11-04 |
175 |
62/2019-20 |
Conducting Bathymetry survey for three reservoirs Singda Khuga and Khupum situated in Manipur state under NHP |
0.00 |
20000.00 |
Publish |
2019-10-23 |
2019-11-08 |
176 |
61/2019-20 |
supply Installation Testing and Commissioning of Electronic Display Boards LED Outdoor Type under NHP for CWPRS Pune 24 |
0.00 |
27000.00 |
Publish |
2019-10-22 |
2019-11-21 |
177 |
57/2019-20 |
Electrical renovation work for SED Office shed at CWPRS Pune |
0.00 |
4000.00 |
Publish |
2019-09-20 |
2019-10-03 |
178 |
58/2019-20 |
Fabrication supply and testing of portable Desilting Basin table model at CWPRS Pune |
0.00 |
5000.00 |
Publish |
2019-09-20 |
2019-10-17 |
179 |
55/2019-20 |
Supply installation testing and commissioning of Concrete and Gement Testing Equipments under DRIP for CWPRS Pune 24 |
0.00 |
26000.00 |
Publish |
2019-09-18 |
2019-10-17 |
180 |
56/2019-20 |
Supply installation testing and commissioning of L type Pitot tube for airl gas under DRIP for CWPRS Pune 24 |
0.00 |
5000.00 |
Publish |
2019-09-18 |
2019-10-17 |
181 |
46/2019-20 |
Supply installation testing and commissioning of different equipment under DRIP for CWPRS Pune 24 |
0.00 |
420000.00 |
Publish |
2019-09-10 |
2019-10-14 |
182 |
42/2019-20 |
Development work of Garden in front of HSRC Hangar CWPRS Pune24 |
0.00 |
4200.00 |
Publish |
2019-09-10 |
2019-09-26 |
183 |
43/2019-20 |
Construction of model tray for Kholongchu HE Project at CSWCS division CWPRS Khadakwasla Pune 24 |
0.00 |
29000.00 |
Publish |
2019-09-10 |
2019-09-30 |
184 |
44/2019-20 |
Minor repair works in Sardar Sarovar Sectional Model at SED Division CWPRS Pune24 |
0.00 |
4000.00 |
Publish |
2019-09-10 |
2019-09-26 |
185 |
45/2019-20 |
Dismantling of 120 m Wave board of RSWG hanger at CHS I Division CWPRS Pune 24 |
0.00 |
2100.00 |
Publish |
2019-09-10 |
2019-09-26 |
186 |
47/2019-20 |
Supply installation testing and commissioning of different equipment under DRIP for CWPRS Pune 24 |
0.00 |
260000.00 |
Publish |
2019-09-10 |
2019-10-14 |
187 |
48/2019-20 |
Supply installation testing and commissioning of UV CHAMBER FOR GEOTEXTILES under DRIP for CWPRS Pune 24 |
0.00 |
250000.00 |
Publish |
2019-09-10 |
2019-10-15 |
188 |
49/2019-20 |
Supply installation testing and commissioning of 32 channel data logger with data retrieval system for strain measurement by 120 ohm electrical resistance strain gauges using Quarter Bridge under DRIP for CWPRS Pune 24 |
0.00 |
180000.00 |
Publish |
2019-09-10 |
2019-10-15 |
189 |
50/2019-20 |
Supply installation testing and commissioning of PORTABLE WELL LOGGING UNIT under DRIP for CWPRS Pune 24 |
0.00 |
500000.00 |
Publish |
2019-09-10 |
2019-10-16 |
190 |
51/2019-20 |
Supply installation testing and commissioning of LABORATORY FLUOROMETER under DRIP for CWPRS Pune 24 |
0.00 |
40000.00 |
Publish |
2019-09-10 |
2019-10-16 |
191 |
52/2019-20 |
Supply installation testing and commissioning of VIBRATION MONITORING SYSTEM WITH SIGNAL ANALYSIS SOFTWARE INCLUDING ACCESSORIES under DRIP for CWPRS Pune 24 |
0.00 |
50000.00 |
Publish |
2019-09-10 |
2019-10-17 |
192 |
53/2019-20 |
Supply installation testing and commissioning of Non Destructive Testing Equipments under DRIP for CWPRS Pune 24 as per list of equipments |
0.00 |
140000.00 |
Publish |
2019-09-10 |
2019-10-17 |
193 |
54/2019-20 |
Supply Installation Testing and Commissioning of Bathymetry Survey System consisting of Echo Sounder Dual Frequency DGPS SVP Data Acquisition System along with Processing Software |
0.00 |
104000.00 |
Publish |
2019-09-10 |
2019-10-21 |
194 |
40/2019-20 |
Providing installation commissioning and testing of LT Control Panel distribution board and laying of underground cable from substation No2 to main building switch room etc at CWPRS Pune |
0.00 |
56000.00 |
Publish |
2019-09-06 |
2019-09-23 |
195 |
41/2019-20 |
Electrical work for AWS switch room and WQAM River Rejuvenation division at CWPRS Pune |
0.00 |
2000.00 |
Publish |
2019-09-06 |
2019-09-24 |
196 |
38/2019-20 |
Conducting Bathymetry and associated survey for the assessment of sediment transport in coastal region of Karnataka state |
0.00 |
104000.00 |
Publish |
2019-09-04 |
2019-10-16 |
197 |
33/2019-20 |
Maintenance and up keeping of day to day activities for Pakul Dul and Kiru H E Project at CWPRS Pune 24 |
0.00 |
21000.00 |
Publish |
2019-08-30 |
2019-09-16 |
198 |
34/2019-20 |
Maintenance and up keeping of day to day activities in physical models of New Mangalore Chennai and Kamrajar Port at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-08-30 |
2019-09-17 |
199 |
35/2019-20 |
Maintenance and up keeping of day to day activities in physical models of Mormugao Port and Multipurpose Wave Basin hangar at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-08-30 |
2019-09-17 |
200 |
36/2019-20 |
Maintenance and up keeping of day to day activities in physical models of Kosi Yamuna and Farakka at CWPRS Pune 24 |
0.00 |
20000.00 |
Publish |
2019-08-30 |
2019-09-17 |
201 |
37/2019-20 |
Maintenance and up keeping of day to day activities in and around of Departmental CanteenI at CWPRS Pune 24 |
0.00 |
6000.00 |
Publish |
2019-08-30 |
2019-09-19 |
202 |
32/2019-20 |
Maintenance and up keeping of day to day activities for Kwar H E Project at CWPRS Pune 24 |
0.00 |
26000.00 |
Publish |
2019-08-29 |
2019-09-16 |
203 |
30/2019-20 |
Supply lnstallation Testing and Commissioning of Electromagnetic flow meters under NHP for CWPRS Pune 24 |
0.00 |
30100.00 |
Publish |
2019-07-25 |
2019-08-27 |
204 |
25/2019-20 |
Construction of data logger room behind canal automation laboratory under NHP in CWPRS Kdk Pune 24 |
0.00 |
20000.00 |
Publish |
2019-07-10 |
2019-08-08 |
205 |
26/2019-20 |
Supply Installation Testing and Commissioning of Remote Access Terminals with spares and accessories under NHP for CWPRS Pune 24 |
0.00 |
11500.00 |
Publish |
2019-07-10 |
2019-08-09 |
206 |
27/2019-20 |
Supply Installation Testing and Commissioning of Water Quality Monitor with Data Logger under NHP for CWPRS Pune 24 |
0.00 |
30000.00 |
Publish |
2019-07-10 |
2019-08-09 |
207 |
28/2019-20 |
Renovation of Office Shed of RH Division including roofing painting and false ceiling in Compartment No Eleven at CWPRS Pune 411024 |
0.00 |
15000.00 |
Publish |
2019-07-10 |
2019-07-29 |
208 |
24/2019-20 |
Supply lnstallation Testing and Commissioning of Furniture Officellab under NHP for CWPRS Pune 24 |
0.00 |
46000.00 |
Publish |
2019-07-05 |
2019-08-06 |
209 |
22/2019-20 |
Up gradation of Current Meter Rating Trolley CMRT facility including training spare parts and Annual Maintenance Contract AMC under National Hydrology Project NHP for CWPRS Pune 24 |
0.00 |
438000.00 |
Publish |
2019-07-05 |
2019-08-19 |
210 |
23/2019-20 |
Supply Installation Testing and Commissioning of Acoustic Doppler Velocimeters under NHP for CWPRS Pune 24 |
0.00 |
58000.00 |
Publish |
2019-07-05 |
2019-08-06 |
211 |
20/2019-20 |
Supply Installation Commissioning and testing of LT Panel Starters and Laying of Cable at 100 and 120 Cusec pump houses at CWPRS Pune 24 |
0.00 |
42000.00 |
Publish |
2019-06-25 |
2019-07-11 |
212 |
19/2019-20 |
Fabrication and installation of model of Hirakhud Dam Odisha at CWPRS Pune 24 |
0.00 |
7500.00 |
Publish |
2019-06-12 |
2019-06-27 |
213 |
18/2019-20 |
Providing and supply of services for up keeping of day to day activities for Khandla Port Model at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-06-10 |
2019-06-27 |
214 |
17/2019-20 |
Providing and supply of services for maintaining and up keeping of CMC Divisional buildings its surrounding area existing garden and infradtructural items at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-06-07 |
2019-06-27 |
215 |
15/2019-20 |
Maintenance and up keeping of day to day activities for RSWG Wave Flume Hanger and Office Building in CHS I DIvision at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-06-07 |
2019-06-25 |
216 |
16/2019-20 |
Maintenance and up keeping of day to day activities for Cochin Port physical Model at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2019-06-07 |
2019-06-27 |
217 |
13/2019-20 |
Maintenance and experiment related activities of banas river physical model for NMC studies at CWPRS Pune |
0.00 |
4000.00 |
Publish |
2019-06-04 |
2019-06-25 |
218 |
14/2019-20 |
Maintenance and up keeping of day to day activities for studies of Domihira Dam Project Palghar Maharashtra at CWPRS Pune 24 |
0.00 |
3000.00 |
Publish |
2019-06-04 |
2019-06-25 |
219 |
10/2019-20 |
Development of upholstery for establishment of meeting room in SED Division CWPRS Pune 24 |
0.00 |
9500.00 |
Publish |
2019-05-30 |
2019-06-18 |
220 |
11/2019-20 |
Repairs and strengthening of compound wall behind MPWB hangar at CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2019-05-30 |
2019-06-18 |
221 |
09/2019-20 |
Renovation of Chennai Port Model Bed as per latest Bathymetry in PH II Division CWPRS Pune 411024 |
0.00 |
21000.00 |
Publish |
2019-05-24 |
2019-06-12 |
222 |
08/2019-20 |
Aluminium partition works and minor civil repair works in Library Building at CWPRS Pune 24 |
0.00 |
3000.00 |
Publish |
2019-05-22 |
2019-06-11 |
223 |
07/2019-20 |
Fabrication supply and testing of portable De silting Basin Table Model at CWPRS Pune 24 |
0.00 |
3500.00 |
Publish |
2019-05-10 |
2019-05-28 |
224 |
04/2019-20 |
Supply installation Testing and Commissioning of Advanced water hammer surge analysis software under NHP for CWPRS Pune24 |
0.00 |
30000.00 |
Publish |
2019-05-03 |
2019-06-03 |
225 |
05/2019-20 |
Maintenance and up keeping of day to day activities of Wave Flume Hanger Multipurpose Wave basin hanger and Office building in CHS II division at CWPRS Pune 24 |
0.00 |
13000.00 |
Publish |
2019-05-03 |
2019-05-15 |
226 |
01/2019-20 |
Supply installation Testing and Commissioning of 24 and 12 channel Hydrophone chains for CWPRS Pune 24 |
0.00 |
60000.00 |
Publish |
2019-05-02 |
2019-06-03 |
227 |
02/2019-20 |
Supply installation Testing and Commissioning of Fuming Chamber under NHP for CWPRS Pune 24 |
0.00 |
8000.00 |
Publish |
2019-05-02 |
2019-06-03 |
228 |
03/2019-20 |
Supply installation Testing and Commissioning of Small Current Meters under NHP for CWPRS Pune 24 |
0.00 |
30000.00 |
Publish |
2019-05-02 |
2019-06-03 |
229 |
141/2018-19 |
Minor repair work for Bill Section and Post Office Building of CWPRS Pune 24 |
0.00 |
27000.00 |
Publish |
2019-03-27 |
2019-04-11 |
230 |
122R/2018-19 |
Maintenance and up keeping of day to day activities in physical Models of Project Varsha and Visakhapatnam port CWPRS Pune 24 |
0.00 |
6500.00 |
Publish |
2019-03-26 |
2019-04-11 |
231 |
138/2018-19 |
Setting up of computing facility with minor civil works in PH II division for Conducting numerical model studies and data analysis at CWPRS Pune 24 |
0.00 |
31000.00 |
Publish |
2019-03-20 |
2019-04-15 |
232 |
139/2018-19 |
Up gradation of mathematical computing facilities etc for MMCE II Division at MMCE Building CWPRS Pune 24 |
0.00 |
20000.00 |
Publish |
2019-03-20 |
2019-04-15 |
233 |
140/2018-19 |
Setting up of Mathematical Modeling facility in BE Division at CWPRS Pune 24 |
0.00 |
31000.00 |
Publish |
2019-03-20 |
2019-04-15 |
234 |
136/2018-19 |
Conducting hydrographic survey at left bank in front of proposed additional spillway of Hirakud Dam Dist Sambalpur Odisha |
0.00 |
5000.00 |
Publish |
2019-03-18 |
2019-04-02 |
235 |
135/2018-19 |
Fabrication and installation of Table models of Paradip Port at CWPRS Pune 24 and at Paradip Port Odisha |
0.00 |
59000.00 |
Publish |
2019-03-14 |
2019-04-11 |
236 |
134/2018-19 |
Replacement of damaged GS Sheet of roofing with new to the existing Tidal Model Shed pertaining to CHS III Division at CWPRS Pune 24 |
0.00 |
8000.00 |
Publish |
2019-03-01 |
2019-03-14 |
237 |
132/2018-19 |
Electrical works for River engineering hanger at CWPRS Pune 24 |
0.00 |
48100.00 |
Publish |
2019-02-28 |
2019-03-25 |
238 |
133/2018-19 |
Electrical Renovation work of HSRC Hanger at CWPRS Pune 24 |
0.00 |
32000.00 |
Publish |
2019-02-28 |
2019-03-25 |
239 |
131/2018-19 |
Construction of physical wave model for fishing harbor at Mopla Bay Kerala in Multi purpose Wave Basin Hangar at CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2019-02-25 |
2019-03-13 |
240 |
129/2018-19 |
Construction of room for check metering KIOSK for solar power at CWPRS Pune 24 |
0.00 |
8000.00 |
Publish |
2019-02-22 |
2019-03-05 |
241 |
130/2018-19 |
Supply Installation Commissioning and testing of 180 KVA DG Set near DOHI building for Director Office Auditorium and other division at CWPRS Pune24 |
0.00 |
36000.00 |
Publish |
2019-02-22 |
2019-03-14 |
242 |
128/2018-19 |
Rectification of leakages in toilet block including laying of sewer line for OCL building at CWPRS Pune 24 |
0.00 |
12000.00 |
Publish |
2019-02-21 |
2019-03-07 |
243 |
127/2018-19 |
Conversion of LT overhead line of Substation No3 into underground cable and Installation of street light poles and LED fittings of substation No 3 and 4 and 11 in CWPRS Pune 24 |
0.00 |
69000.00 |
Publish |
2019-02-15 |
2019-03-07 |
244 |
125/2018-19 |
Construction of Model Tray for Kwar HE Project 1 70 scale 3D Comprehensive Model at CWPRS Pune 24 |
0.00 |
21600.00 |
Publish |
2019-02-06 |
2019-02-26 |
245 |
126/2018-19 |
Electrical renovation work of DOHI Building Room No106 and 107 and Vigilance Section at CWPRS Pune 24 |
0.00 |
9000.00 |
Publish |
2019-02-06 |
2019-02-26 |
246 |
123/2018-19 |
Supply Installation Testing and Commissioning of Portable Clamp on Type Energy Analyser at CWPRS Pune 24 |
0.00 |
14000.00 |
Publish |
2019-01-30 |
2019-02-20 |
247 |
124/2018-19 |
Supply installation Testing and Commissioning of Constant Temperature water bath at CWPRS Pune 24 |
0.00 |
8000.00 |
Publish |
2019-01-30 |
2019-02-20 |
248 |
122/2018-19 |
Maintenance and up keeping of day to day activities in physical Models of Project Varsha and Visakhapatnam port CWPRS Pune 24 |
0.00 |
6500.00 |
Publish |
2019-01-28 |
2019-02-11 |
249 |
121/2018-19 |
Supplying Commissioning and testing of stand by pumping system at Old and New Filtration Plants OCL building pump houses at CWPRS Pune24 |
0.00 |
11000.00 |
Publish |
2019-01-24 |
2019-02-07 |
250 |
99R/2018-19 |
Maintenance and up keeping of day to day activities for studies of Bhatsa Dam project thane Maharashtra at CWPRS Pune24 |
0.00 |
2500.00 |
Publish |
2019-01-22 |
2019-02-06 |
251 |
120/2018-19 |
Renovation of Random Sea Wave Flume in Multi purpose Wave Basin Hanger at CWPRS Pune 24 |
0.00 |
34000.00 |
Publish |
2019-01-17 |
2019-02-06 |
252 |
118/2018-19 |
Maintenance and up keeping day to day activities of Mumbai Port Model at CWPRS Pune 24 |
0.00 |
6500.00 |
Publish |
2019-01-14 |
2019-01-29 |
253 |
119/2018-19 |
Development of work around River Hydraulic Division at CWPRS Pune 24 |
0.00 |
8500.00 |
Publish |
2019-01-14 |
2019-01-29 |
254 |
116/2018-19 |
Supply installation Testing and Commissioning of Groundwater Level Sensors with Vent Tube under NHP for CWPRS Pune 24 |
0.00 |
6000.00 |
Publish |
2019-01-03 |
2019-01-29 |
255 |
117/2018-19 |
Supply installation Testing and Commissioning of Groundwater Level Sensors without Vent Tube under NHP for CWPRS Pune 24 |
0.00 |
6000.00 |
Publish |
2019-01-03 |
2019-01-29 |
256 |
115/2018-19 |
Renovation of water control gates including civil structures in water recirculation system under NHP at CWPRS Pune 24 |
0.00 |
25500.00 |
Publish |
2018-12-31 |
2019-01-22 |
257 |
114/2018-19 |
Supply installation Testing and Commissioning of PC Based 32 Channel Temperature Data Acquisition System at CWPRS Pune24 |
0.00 |
16400.00 |
Publish |
2018-12-27 |
2019-01-21 |
258 |
113/2018-19 |
Supply installation Testing and Commissioning of Digital Micro earthquake Recorder at CWPRS Pune 24 |
0.00 |
300000.00 |
Publish |
2018-12-21 |
2019-01-29 |
259 |
111/2018-19 |
Renovation of Electrical work in PH I and CHS II division at CW and PRS Pune 24 |
0.00 |
2500.00 |
Publish |
2018-11-23 |
2018-12-06 |
260 |
112/2018-19 |
Maintenance and up keeping of day to day activities for studies of Temghar Dam Project at CWPRS Pune 24 |
0.00 |
2400.00 |
Publish |
2018-11-23 |
2018-12-06 |
261 |
110/2018-19 |
Extension of Old UNDP office building including up gradation of mathematical computing facilities etc for PH II Division at CWPRS Pune 24 |
0.00 |
65500.00 |
Publish |
2018-11-22 |
2018-12-11 |
262 |
109/2018-19 |
Supply Installation Testing and Commissioning of 125 KVA DG Set under NHP for CWPRS Pune 24 |
0.00 |
23500.00 |
Publish |
2018-11-21 |
2018-12-18 |
263 |
106/2018-19 |
Supply lnstallation Testing and Commissioning of Automatic Weather Station DataloggerTelemetry under NHP for CWPRS Pune 24 |
0.00 |
65500.00 |
Publish |
2018-11-16 |
2018-12-17 |
264 |
108/2018-19 |
Supply lnstallation Testing and Commissioning of Electronic Disptav Boaros LED OUT DOOR TYPE under NHP for CWPRS Pune 24 |
0.00 |
14000.00 |
Publish |
2018-11-16 |
2018-12-17 |
265 |
106/2018-19 |
Conducting Bathymetry Survey using multi beam echo sounder for assessment of reservoir capacity and sedimentation at lndira Sagar Power Station NHDC Ltd Khandwa Madhya Pradesh |
0.00 |
6000.00 |
Publish |
2018-11-12 |
2018-11-28 |
266 |
105/2018-19 |
Conducting Bathymetry Survey using single beam echosounder for assessment of reservoir capacity and sedimentation at Indira Sagar Power Station NHDC Ltd Khandwa Madhya Pradesh |
0.00 |
75000.00 |
Publish |
2018-11-06 |
2018-11-21 |
267 |
103/2018-19 |
Supply lnstallation Testing and Commissioning of Proportionate Temperature Controller cum indicator with data acquisition System at CWPRS Pune 24 |
0.00 |
24000.00 |
Publish |
2018-11-02 |
2018-12-04 |
268 |
104/2018-19 |
Supply lnstallation Testing and Commissioning of High Speed Cementitious Grout Mixer and Grout Pump at CWPRS Pune 24 |
0.00 |
8000.00 |
Publish |
2018-11-02 |
2018-12-04 |
269 |
101/2018-19 |
Minor repair works to Departmental Canteen No I and II at CWPRS Pune 24 |
0.00 |
12000.00 |
Publish |
2018-11-01 |
2018-11-21 |
270 |
102/2018-19 |
Supply lnstallation Testing and Commissioning of SURFER Software at CWPRS Pune 24 |
0.00 |
6700.00 |
Publish |
2018-11-01 |
2018-11-27 |
271 |
98/2018-19 |
Renovation of PMU office in OCL bldg under NHP at CWPRS Pune24 |
0.00 |
6000.00 |
Publish |
2018-10-31 |
2018-11-19 |
272 |
99/2018-19 |
Maintenance and up keeping of day to day activities for studies of Bhatsa Dan Project Thane Maharashtra at CWPRS Pune24 |
0.00 |
2500.00 |
Publish |
2018-10-31 |
2018-11-15 |
273 |
100/2018-19 |
Supply lnstallation Testing and Commissioning of Remote Access Terminals under NHP for CWPRS Pune 24 |
0.00 |
11500.00 |
Publish |
2018-10-31 |
2018-12-03 |
274 |
97/2018-19 |
Supply lnstallation Testing and Commissioning of MATLAB Software and its tools at CWPRS Pune24 |
0.00 |
30000.00 |
Publish |
2018-10-30 |
2018-12-03 |
275 |
95/2018-19 |
Supply Installation Testing and Commissioning of 260 t W Thyristorised DC Drives at HMC Lab under NHP for CWPRS Pune24 |
0.00 |
47200.00 |
Publish |
2018-10-29 |
2018-11-26 |
276 |
96/2018-19 |
Fibracation supply installation and commissioning of Water wave data acquisition system for physical wave model of Varsha port and Visakhapatnam port at CWPRS Pune24 |
0.00 |
8000.00 |
Publish |
2018-10-29 |
2018-11-19 |
277 |
92/2018-19 |
Renovation of CMRT offices under NHP at CWPRS Pune24 |
0.00 |
36500.00 |
Publish |
2018-10-25 |
2018-11-19 |
278 |
91/2018-19 |
De silting of 120 cusec water re circulation system under NHP at CWPRS Pune |
0.00 |
24500.00 |
Publish |
2018-10-25 |
2018-11-19 |
279 |
93/2018-19 |
Supply lnstallation Testing and Commissioning of Procurement of Battery Operated fork lift with 2Ton Capacity under NHP for CWPRS Pune24 |
0.00 |
28000.00 |
Publish |
2018-10-25 |
2018-11-26 |
280 |
89/2018-19 |
Construction of Model 2D for Spilway of Lakhwar HE Project Uttarakhand at SED Division CWPRS Pune24 |
0.00 |
44000.00 |
Publish |
2018-10-24 |
2018-11-13 |
281 |
90/2018-19 |
Replacement of roof sheets at Tajewala hanger CWPRS Pune24 |
0.00 |
60000.00 |
Publish |
2018-10-24 |
2018-11-13 |
282 |
88/2018-19 |
Construction of inlet system for 2D flume in HAPT Division at CWPRS Pun24 |
0.00 |
6000.00 |
Publish |
2018-10-22 |
2018-11-01 |
283 |
86/2018-19 |
Up gradation and set up of central Mathematical Computing Facilities for PH I Division at CWPRS Pune24 |
0.00 |
20500.00 |
Publish |
2018-10-10 |
2018-10-22 |
284 |
85/2018-19 |
Renovation of toilet block at Departmental Canteen II at CWPRS Pune24 |
0.00 |
3900.00 |
Publish |
2018-10-09 |
2018-10-22 |
285 |
82/2018-19 |
Renovation of division and Construction of Toilet Block in HAPT Division at CWPRS Pune24 |
0.00 |
27600.00 |
Publish |
2018-09-20 |
2018-10-04 |
286 |
83/2018-19 |
Provision of chain link fencing and minor civil works in Isotope and ES laboratory at CWPRS Pune24 |
0.00 |
17100.00 |
Publish |
2018-09-20 |
2018-10-04 |
287 |
80/2018-19 |
Minor repair works and painting of Telephone exchange building at CWPRS Pune24 |
0.00 |
2800.00 |
Publish |
2018-09-20 |
2018-10-03 |
288 |
81/2018-19 |
Maintenance and up keeping of day to day activities of NHP Building at CWPRS Pune24 |
0.00 |
6300.00 |
Publish |
2018-09-20 |
2018-10-03 |
289 |
78/2018-19 |
Renovation of Toilets and Aluminium windows in Canara bank building of CWPRS Pune 24 |
0.00 |
3900.00 |
Publish |
2018-09-20 |
2018-10-03 |
290 |
79/2018-19 |
Providing and fixing Aluminium windows with glass panelling in Room Nos 104 206 and 207 of MMCE Division at CWPRS Pune24 |
0.00 |
2000.00 |
Publish |
2018-09-20 |
2018-10-03 |
291 |
76/2018-19 |
Supply lnstallation Testing and Commissioning of Water Level Sensors along with Data Logger under NHP for CWPRS Pune24 |
0.00 |
16000.00 |
Publish |
2018-09-19 |
2018-10-22 |
292 |
77/2018-19 |
Supply lnstallation Testing and Commissioning of Triaxial Borehole Geophones for CWPRS Pune 24 |
0.00 |
26000.00 |
Publish |
2018-09-19 |
2018-10-22 |
293 |
67/2018-19 |
Supply Installation Testing and Commissioning of Concrete and Mortar Permeability Apparatus for CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2018-09-07 |
2018-10-01 |
294 |
34-R/2018-19 |
Supply installation testing and commissioning of feeder pillar and cable laying at SM Division pump house Installation of street light poles around model and renovation of old office shed at CWPRS Pune 24 |
0.00 |
16000.00 |
Publish |
2018-09-06 |
2018-09-17 |
295 |
66/2018-19 |
Supply lnstallation Testing and Commissionrng of Sensors Testing Chamber under NHP for CWPRS Pune 24 |
0.00 |
70000.00 |
Publish |
2018-09-06 |
2018-10-05 |
296 |
65/2018-19 |
Supply Installation testing and commissioning of Wave Rider Buoy with Accessories and Spares under NHP for CWPRS Pune 24 |
0.00 |
280000.00 |
Publish |
2018-09-05 |
2018-10-08 |
297 |
62/2018-19 |
Maintenance and up keeping of day to day activities in physical models of New Mangalore Port Chennai Port and Kamrajar Port at CWPRS Pune 24 |
0.00 |
5300.00 |
Publish |
2018-08-31 |
2018-09-10 |
298 |
64/2018-19 |
Annual Contract for cleaning of garbage Dust Bins at CWPRS Staff Colony Pune 24 |
0.00 |
3000.00 |
Publish |
2018-08-31 |
2018-09-10 |
299 |
63/2018-19 |
Maintenance of Garden infront of SED Division planter of CWPRS Gate No 2 Entrance of Residential Complex and CPC AEE office at CWPRS Pune 24 |
0.00 |
4000.00 |
Publish |
2018-08-31 |
2018-09-10 |
300 |
61/2018-19 |
Supply and Installation of Furniture Office Lab under NHP for CWPRS Pune24 |
0.00 |
46000.00 |
Publish |
2018-08-30 |
2018-09-28 |
301 |
60/2018-19 |
Supply lnstallation Testing and Commissioning of Fuming Chamber under NHP For CWPRS Pune24 |
0.00 |
3500.00 |
Publish |
2018-08-28 |
2018-09-17 |
302 |
58/2018-19 |
Jungle cleaning along the internal roads and surrounding the buildings of CWPRS Office and Residential Complex at CWPRS Pune24 |
0.00 |
11300.00 |
Publish |
2018-08-14 |
2018-08-27 |
303 |
59/2018-19 |
Supply Installation Testing and Commissioning of Ltype Pitot tubes under NHP for CWPRS Pune 24 |
0.00 |
12800.00 |
Publish |
2018-08-14 |
2018-09-14 |
304 |
57/2018-19 |
Painting of road side kerb stone at CWPRS campusune24 |
0.00 |
13100.00 |
Publish |
2018-08-14 |
2018-08-27 |
305 |
52/2018-19 |
Renovation of rainwater harvesting system in OCL Building at CWPRS Pune24 |
0.00 |
4700.00 |
Publish |
2018-08-10 |
2018-08-20 |
306 |
53/2018-19 |
Extension of Pump House along with providing fixing testing commissioning of 5hp pump at Kamrajar Port Model pump house at CWPRS Pune24 |
0.00 |
7500.00 |
Publish |
2018-08-10 |
2018-08-20 |
307 |
55/2018-19 |
Maintenance and up keeping of day to day activities for studies of Lower Tapi Project Jalgaon Maharashtra at CWPRS Pune24 |
0.00 |
2500.00 |
Publish |
2018-08-10 |
2018-08-20 |
308 |
54/2018-19 |
Providing up holstery in SMA Division at CWPRS Pune24 |
0.00 |
2300.00 |
Publish |
2018-08-10 |
2018-08-28 |
309 |
50/2018-19 |
Supply installation testing and commissioning of Electronic Water Level Sounder Meter under NHP for CWPRS Pune 24 |
0.00 |
4000.00 |
Publish |
2018-08-07 |
2018-09-04 |
310 |
51/2018-19 |
Supply Installation Testing and Commissioning of Electro Magnetic Flow meters with existing SCADA at model canal under NHP for CWPRS Pune 24 |
0.00 |
11000.00 |
Publish |
2018-08-07 |
2018-09-04 |
311 |
49/2018-19 |
Development of Infrastructure facilities for establishment of egovernance in Administrative Section at CWPRS Pune24 |
0.00 |
9500.00 |
Publish |
2018-08-07 |
2018-08-20 |
312 |
48/2018-19 |
Supply Installalion Testing and Commissioning of Groundwater Level Sensors without Vent Tube Qty 2 no and Groundwater Level Sensors with Vent Tuhe Qty 2 no undet NHP for CWPRS Pune 24 |
0.00 |
12000.00 |
Publish |
2018-08-03 |
2018-08-28 |
313 |
56/2018-19 |
Supply Installalion Testing and Commissioning of Groundwater Level Sensors without Vent Tube Qty 2 and Groundwater Leyel Sensors with Vent Tuhe Qty 2 undet NHP for CWPRS Pune 24 |
0.00 |
12000.00 |
Publish |
2018-08-03 |
2018-08-28 |
314 |
47/2018-19 |
Cleaning and sweeping of Toilet Blocks in CWPRS Campus under Swachhta Action Plan SAP at Khadakwasla Pune 24 |
0.00 |
23180.00 |
Publish |
2018-08-03 |
2018-08-20 |
315 |
46/2018-19 |
Renovation of Toilets blocks in OCL Building at CWPRS Pune 24 |
0.00 |
13700.00 |
Publish |
2018-08-02 |
2018-08-16 |
316 |
44/2018-19 |
Construction of model tray for Spillway of Kiru HE project JK 3D Comprehensive model at CWPRS Pune24 |
0.00 |
146500.00 |
Publish |
2018-08-01 |
2018-08-20 |
317 |
45/2018-19 |
Major repair and surrounding development of shed No4 in SED Division at CWPRS Pune24 |
0.00 |
42500.00 |
Publish |
2018-08-01 |
2018-08-13 |
318 |
43/2018-19 |
Renovation of HSRC hangar in SED Division at CWPRS Pune24 |
0.00 |
78500.00 |
Publish |
2018-07-31 |
2018-08-13 |
319 |
42/2018-19 |
Construction of inlet channel for Durgapur Barrage West Bengal at compartment No8 at CWPRS Pune 24 |
0.00 |
2800.00 |
Publish |
2018-07-27 |
2018-08-02 |
320 |
40/2018-19 |
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF UNDERWATER ELECTRICAL RESISTIVITY IMAGING SYSTEM UNDER NHP FOR CWPRS PUNE 24 |
0.00 |
120000.00 |
Publish |
2018-07-20 |
2018-08-27 |
321 |
41/2018-19 |
Construction of handicapped ramp in HMC Division at CWPRS Pune 24 |
0.00 |
2230.00 |
Publish |
2018-07-20 |
2018-08-01 |
322 |
35/2018-19 |
Supply Installation testing and Commissioning of 75 Channel Temperature Water Level and Velocity Data Acquisition System at CWPRS Pune24 |
0.00 |
72000.00 |
Publish |
2018-07-17 |
2018-08-20 |
323 |
36/2018-19 |
Supply installation testing and commissioning of 48 Channel high resolution engineering seismograph with accessories processing and interpretation software at CWPRS Pune 24 |
0.00 |
100000.00 |
Publish |
2018-07-17 |
2018-08-20 |
324 |
37/2018-19 |
Supply installation testing and commissioning of PLC based Automatic Tide Generating system ATGS3 units along with gear box and radial gate assembly for physical tidal model at CWPRS Pune 24 |
0.00 |
60000.00 |
Publish |
2018-07-17 |
2018-08-20 |
325 |
38/2018-19 |
Supply Installation and Commissioning of Tensile Testing Machine for Geotextile at CWPRS Pune24 |
0.00 |
60000.00 |
Publish |
2018-07-17 |
2018-08-20 |
326 |
39/2018-19 |
SUPPLY INSTALLATION AND COMMISSIONING OF CYCLIC TRIAXIAL SOIL TEST SYSTEM AT CWPRS PUNE24 |
0.00 |
100000.00 |
Publish |
2018-07-17 |
2018-08-22 |
327 |
34/2018-2019 |
Supply installation testing and commissioning of feeder pillar and cable laying at SM Division pump house Installation of street light poles around model and renovation of old office shed at CWPRS Pune24 |
0.00 |
12700.00 |
Publish |
2018-07-12 |
2018-07-23 |
328 |
01/2018-19 |
Landscaping between Road and Canal in front of PH II Division at CWPRS Pune 24 |
0.00 |
2500.00 |
Publish |
2018-07-10 |
2018-07-23 |
329 |
33/2018-19 |
Repairs to Compound wall along Khadakwasla road in compartment No 14 at CWPRS Pune24 |
0.00 |
6650.00 |
Publish |
2018-07-02 |
2018-07-11 |
330 |
31/2018-19 |
Supply installation testing commissioning of portable Two Channel Clamp on Ultrasonic Flow Meter under NHP at CWPRS Pune |
0.00 |
19520.00 |
Publish |
2018-06-25 |
2018-07-19 |
331 |
29/2018-19 |
Supply installation testing and commissioning of SURFER Software under NHP for CWPRS Pune24 |
0.00 |
2800.00 |
Publish |
2018-06-22 |
2018-07-16 |
332 |
30/2018-19 |
Supply installation testing and commissioning of TerrSet Software under NHP for CWPRS Pune24 |
0.00 |
4000.00 |
Publish |
2018-06-22 |
2018-07-17 |
333 |
28/2018-19 |
Supply Installation testing and commissioning of Sealed Maintenance Free SMF Batteries 12V65AH at CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2018-06-18 |
2018-07-09 |
334 |
27/2018-19 |
Minor civil works in Kamrajar Port Model at CWPRS Pune 24 |
0.00 |
4510.00 |
Publish |
2018-06-15 |
2018-07-19 |
335 |
26/2018-19 |
Repairs to 100 cusec return channel start in compartment No 5 at CWPRS Pune 24 |
0.00 |
17264.00 |
Publish |
2018-06-15 |
2018-07-09 |
336 |
23/2018-19 |
Repairs and strengthening of Compound Wall in Compartment No 5 at CWPRS Pune 24 |
0.00 |
7565.00 |
Publish |
2018-06-15 |
2018-06-25 |
337 |
24/2018-19 |
Up gradation and enhancement of mathematical computing facility in MMCE Division at CWPRS Pune 24 |
0.00 |
18640.00 |
Publish |
2018-06-15 |
2018-07-10 |
338 |
25/2018-19 |
Miscellaneous works in Durgapur model and RH Division at CWPRS Pune24 |
0.00 |
12425.00 |
Publish |
2018-06-15 |
2018-06-28 |
339 |
21/2018-19 |
Construction of model tray for Additional Spillway of Hirakud Dam Odisha 3D Comprehensive Model at CWPRS Kdk Pune 24 |
0.00 |
95370.00 |
Publish |
2018-06-13 |
2018-06-27 |
340 |
20/2018-19 |
Construction of Inlet System and Model Tray for Spillway and Power Intake of Arun 3 HE Project 3D Comprehensive Model at CWPRS Pune 24 |
0.00 |
50850.00 |
Publish |
2018-06-13 |
2018-06-27 |
341 |
22/2018-19 |
Construction of Kiru Kwar Pakal Dul Reservoir flushing Models at CWPRS Pune24 |
0.00 |
44000.00 |
Publish |
2018-06-13 |
2018-06-27 |
342 |
17/2018-19 |
Maintenance and upkeeping of day to day activities for CMC divisional building its surrounding area existing garden etc at CWPRS Pune 24 |
0.00 |
6500.00 |
Publish |
2018-05-30 |
2018-06-11 |
343 |
19/2018-19 |
Consultancy Services for assistance in acquiring NABL ISO IECI 17025 2017 Certification for General Requirements for the competence of testing and calibration Laboratories and for Implementation at five Laboratories of CWPRS Pune 411024 |
0.00 |
28000.00 |
Publish |
2018-05-30 |
2018-06-26 |
344 |
15/2018-19 |
Maintenance and up keeping of day to day activities for Kosi Yamuna and Farakka physical models at CWPRS Pune 24 |
0.00 |
18500.00 |
Publish |
2018-05-24 |
2018-06-04 |
345 |
16/2018-19 |
Maintenance and up keeping of day to day activities Cochin Port Physical models at CWPRS Pune 24 |
0.00 |
7000.00 |
Publish |
2018-05-24 |
2018-06-04 |
346 |
14/2018-19 |
Construction of physical wave model for wave tranquility studies for development of Port infrastructure at Compbell Bay at Multi Purpose Wave Basin Hangar at CWPRS Pune24 |
0.00 |
9000.00 |
Publish |
2018-05-21 |
2018-05-31 |
347 |
13/2018-19 |
Supply of Soil Laboratory Equipments at CWPRS Pune |
0.00 |
13000.00 |
Publish |
2018-05-18 |
2018-06-13 |
348 |
12/2018-19 |
Supply of Borehole Camera at CWPRS Pune |
0.00 |
20500.00 |
Publish |
2018-05-14 |
2018-06-13 |
349 |
11/2018-19 |
Supply installation testing and commissioning of Well Logging Software at CWPRS Pune |
0.00 |
26000.00 |
Publish |
2018-05-09 |
2018-06-04 |
350 |
10/2018-19 |
Supply installation testing and commissioning of Laboratory Fluorometer at CWPRS Pune |
0.00 |
30000.00 |
Publish |
2018-05-04 |
2018-05-28 |
351 |
08/2018-19 |
Water proofing and painting in DG Rooms of Electrical Division at CWPRS Kdk Pune 24 |
0.00 |
3000.00 |
Publish |
2018-04-27 |
2018-05-10 |
352 |
09/2018-19 |
Maintenance and up keeping of day to day activities of physical wave model of Mormugao Port and Multi Purpose Wave Basin Hangar at CWPRS Pune24 |
0.00 |
6100.00 |
Publish |
2018-04-27 |
2018-05-14 |
353 |
07/2018-19 |
Cleaning of road side drains gutters culverts in CWPRS staff colony Kdk Pune 24 |
0.00 |
2500.00 |
Publish |
2018-04-27 |
2018-05-07 |
354 |
04/2018-19 |
Maintenance and up keeping of day to day activities for RSWG wave flume hanger and office building in CHS I Division at CWPRS Pune 24 |
0.00 |
6500.00 |
Publish |
2018-04-12 |
2018-04-23 |
355 |
03/2018-19 |
Renovation including roofing of Room No 11 in PHI Division at CWPRS Kdk Pune 24 |
0.00 |
13000.00 |
Publish |
2018-04-10 |
2018-04-19 |
356 |
01/2018-19 |
Landscaping between Road and Canal in front of PH II Division at CWPRS Kdk Pune24 |
0.00 |
2500.00 |
Publish |
2018-04-03 |
2018-04-16 |
357 |
62/2017-18 |
Fabrication supply and testing of portable Desilting Basin table model at CWPRS Pune 24 |
0.00 |
3500.00 |
Publish |
2018-04-03 |
2018-04-16 |
358 |
69/2017-18 |
Construction of observatory room for Automatic Weather Station AWS under NHP in CWPRS Kdk Pune 24 |
0.00 |
3000.00 |
Publish |
2018-03-12 |
2018-03-21 |
359 |
70/2017-18 |
Chain link fencing around bore well near Canal Automation Building under NHP in CWPRS Pune24 |
0.00 |
5100.00 |
Publish |
2018-03-12 |
2018-03-21 |
360 |
67/2017-18 |
Maintenance and up keeping of day to day activities before and after construction of physical model of Banas river at CWPRS Pune 24 |
0.00 |
15300.00 |
Publish |
2018-02-20 |
2018-03-06 |
361 |
68/2017-18 |
Construction of Banas River model for NMC studies of SSNNL in Bridge Engineering Division at CWPRS Pune24 |
0.00 |
26581.00 |
Publish |
2018-02-20 |
2018-03-06 |
362 |
64/2017-18 |
Major repair works of toilet in Mechanical Work Shop at CWPRS Pune 24 |
0.00 |
9300.00 |
Publish |
2018-02-09 |
2018-02-26 |
363 |
45/2017-18 |
Fabrication and installation of model parts for 2D sectional model of Hirakud Dam Spillway Odisha at CWPRS Pune |
0.00 |
4710.00 |
Publish |
2018-02-08 |
2018-02-26 |
364 |
63/2017-18 |
Supply installation testing and commissioning of SMF Batteries 12V65AH at CWPRS Pune 24 |
0.00 |
10000.00 |
Publish |
2018-02-06 |
2018-02-23 |
365 |
62/2017-18 |
Fabrication supply and testing of portable Desilting Basin table model at CWPRS Pune |
0.00 |
3500.00 |
Publish |
2018-02-02 |
2018-02-14 |
366 |
61/2017-18 |
Upgradation of Flood Warning System model with PLC based HMIGUI Interface at CWPRS Pune |
0.00 |
5000.00 |
Publish |
2018-02-01 |
2018-02-14 |
367 |
NIT-R 45/2017-18 |
Fabrication and installation of model parts for 2D sectional model of Hirakud Dam Spillway Odisha at CWPRS Pune24 |
0.00 |
4710.00 |
Publish |
2018-01-17 |
2018-01-29 |
368 |
59/2017-18 |
Supply installation testing and commissioning of 100 HP Variable Frequency Drive VFD AC drive starter for Volumetric Laboratory at CWPRS Pune 24 |
0.00 |
5240.00 |
Publish |
2018-01-16 |
2018-02-05 |
369 |
60/2017-18 |
Digitization of Library documents at CWPRS Pune |
0.00 |
14990.00 |
Publish |
2018-01-16 |
2018-02-07 |
370 |
58/2017-18 |
Maintenance and up keeping of day to day activities for studies of Temghar Dam Maharashtra at CWPRS Pune24 |
0.00 |
2100.00 |
Publish |
2018-01-08 |
2018-01-18 |
371 |
57/2017-18 |
Maintenance and up keeping day to day activities of Mumbai Port Model at CWPRS Pune24 |
0.00 |
6100.00 |
Publish |
2018-01-08 |
2018-01-18 |
372 |
53/2017-18 |
Supply Installation Testing Commissioning of LT control panel and LT underground UG Cable at New Filtration Plant in CWPRS Pune 24 |
0.00 |
2900.00 |
Publish |
2017-12-29 |
2018-01-10 |
373 |
55/2017-18 |
Renovation of Electrical work in Tajewala Hanger at CWPRS Pune24 |
0.00 |
13500.00 |
Publish |
2017-12-29 |
2018-01-10 |
374 |
54/2017-18 |
Painting and waterproofing works in Electrical Substation No 8 at CWPRS Pune24 |
0.00 |
1950.00 |
Publish |
2017-12-29 |
2018-01-09 |
375 |
56/2017-18 |
Supply Installation Commissioning and testing of LED luminaries and wall mounted fans in HAPT Division at CWPRS Pune24 |
0.00 |
4150.00 |
Publish |
2017-12-29 |
2018-01-10 |
376 |
NITNO52/2017-18 |
Fabrication Installation Commissioning and Testing of Canal Automation Exhibition model at CWPRS Pune |
0.00 |
17720.00 |
Publish |
2017-12-27 |
2018-01-03 |
377 |
NIT19/2017-18 |
Supplying screening and filling of Khaswa sand for hydraulic model studies of Yamuna River model in compartment NoXI at CWPRS Pune |
0.00 |
3062.00 |
Publish |
2017-08-04 |
2017-08-23 |
378 |
NIT 20/2017-18 |
Repairs and renovation of hangar including painting and roofing etc of 3D comprehensive model of Sardar Sarovar Dam Spillway at SED Division CWPRS Pune |
0.00 |
41530.00 |
Publish |
2017-08-04 |
2017-08-23 |
379 |
322 20 2017-18 |
Repairs and renovation of hanger including painting and roofing of model at CWPRS |
0.00 |
41530.00 |
Publish |
2017-08-04 |
2017-08-23 |
380 |
CPC/708/2017-18 |
Conducting Bathymetry Survey of Shatrunji Reservoir Gujarat |
500.00 |
16200.00 |
Publish |
2017-07-12 |
2017-07-28 |
381 |
707/13/A/2017/249 dated 06/07/2017 |
Landscaping between Road and Canal CWPRS 2017 |
150.00 |
1215.00 |
Publish |
2017-07-07 |
2017-07-26 |
382 |
707/13/A/2017/249 dated 06/07/2017 |
Laying of underground cable at CWPRS 2017 |
500.00 |
9107.00 |
Publish |
2017-07-07 |
2017-07-26 |
383 |
707/13/A/2017/249 dated 06/07/2017 |
Repair work of Octagonal Chamber CWPRS 2017 |
500.00 |
5035.00 |
Publish |
2017-07-07 |
2017-07-26 |
384 |
708/1/Tender/CPC/2017/246 dated 04/07/2017 |
Annual Rate Contract for Hiring of tourist taxi AC and Non AC |
500.00 |
6000.00 |
Publish |
2017-07-06 |
2017-07-20 |
385 |
322 19 2017-18 |
Supplying screening and filing of khaswa sand at model at CWPRS Pune |
0.00 |
3062.00 |
Publish |
2017-07-04 |
2017-08-23 |
386 |
707/13/A/2017/199 dated 21/6/2017 |
Supplying Installation and testing of pump sets at filtration plant CWPRS |
500.00 |
45008.00 |
Publish |
2017-06-21 |
2017-07-14 |
387 |
707/13/A/2017/185 dated 19/6/2017 |
Fabrication roofing and sanitation work at Mumbai Port model |
500.00 |
2672.00 |
Publish |
2017-06-19 |
2017-07-07 |
388 |
707/13/A/2017/185 dated 19/6/2017 |
Supplying stacking and screening of fine river sand |
500.00 |
15310.00 |
Publish |
2017-06-19 |
2017-07-07 |
389 |
707/13/A/2017/185 dated 19/6/2017 |
Painting of Paradip model shed and data acqiuisition rooms CWPRS |
150.00 |
1081.00 |
Publish |
2017-06-19 |
2017-07-07 |
390 |
CPC 10/2017-18 dated 15th may 2017 |
Providing installation testing of suitable pumps of Head range Discharge |
150.00 |
1967.00 |
Publish |
2017-05-15 |
2017-05-31 |
391 |
707/13/A/2017/1339 dated 27/3/2017 |
Construction of model tray for Indira Sagar Dam Spillway model at CWPRS |
500.00 |
13104.00 |
Publish |
2017-03-27 |
2017-04-12 |
392 |
707/13/A/2017/1339 dated 27/3/2017 |
Minor Civil Work in PH I division at CWPRS |
500.00 |
4200.00 |
Publish |
2017-03-27 |
2017-04-12 |
393 |
707/13/A/2017/1339 dated 27/3/2017 |
Renovation of room in office of PH II division CWPRS |
500.00 |
4750.00 |
Publish |
2017-03-27 |
2017-04-12 |
394 |
707/13/A/2017/1332 dated 22/3/2017 |
Providing security arrangements and guardening of property at CWPRS |
1000.00 |
387491.00 |
Publish |
2017-03-22 |
2017-04-11 |
395 |
707/13/A/2017/1315 dated 10/3/2017 |
Renovation of electrical installation at national hydrology lab at CWPRS |
500.00 |
38481.00 |
Publish |
2017-03-16 |
2017-03-30 |
396 |
707/13/A/2017/1315 dated 10/3/2017 |
Renovation of electrical Installation at Guest House hostels and family suit CWPRS |
500.00 |
11969.00 |
Publish |
2017-03-16 |
2017-03-30 |
397 |
707/13/A/2017/1318 dated 15/3/2017 |
Up keeping services at Manglore port model Chennai port model Kamraj port model CWPRS |
500.00 |
5322.00 |
Publish |
2017-03-16 |
2017-03-31 |
398 |
707/13/A/2017/1318 dated 15/3/2017 |
Minor Civil Work in Vishakapatanam model at CWPRS |
500.00 |
7518.00 |
Publish |
2017-03-16 |
2017-03-31 |
399 |
707/13/A/2017/1318 dated 15/3/2017 |
Annual contract for cleaning garbage dustbin of cwprs staff colony |
500.00 |
2514.00 |
Publish |
2017-03-16 |
2017-03-31 |
400 |
707/13/A/2017/1318 dated 15/3/2017 |
Maintenance and up keepingof garden of CMC div CWPRS |
500.00 |
5333.00 |
Publish |
2017-03-16 |
2017-03-31 |
401 |
707/13/A/2017/1315 dated 10/3/2017 |
Development for multipurpose tidal basin at CWPRS |
500.00 |
39646.00 |
Publish |
2017-03-16 |
2017-03-30 |
402 |
707/13/A/2017/1315 dated 10/3/2017 |
Supply Installation testing Commissioning of under ground cable substation cwprs |
500.00 |
11847.00 |
Publish |
2017-03-16 |
2017-03-30 |
403 |
707/13/A/2017/1306 dated 9/3/2017 |
Consultancy service for ISO certification ISO 9001 2015 for CWPRS |
500.00 |
17160.00 |
Publish |
2017-03-14 |
2017-03-31 |
404 |
707/13/A/2017/1306 dated 9/3/2017 |
Renovation of Electrical wiring of D type quarters at CWPRS Colony |
500.00 |
21037.00 |
Publish |
2017-03-14 |
2017-03-29 |
405 |
707/13/A/2017/1306 dated 9/3/2017 |
Electrical Works of hanger of coastal division at CWPRS |
500.00 |
38231.00 |
Publish |
2017-03-14 |
2017-03-29 |
406 |
707/13/A/2017/1168 dated 11/01/2017 |
Renovation and Painting of Chennai Port Wave Model CWPRS |
500.00 |
10791.00 |
Publish |
2017-01-11 |
2017-01-24 |
407 |
708/1/SMA/FSI/2016/1113 dated 23/12/2016 |
Procurement of Commercial and Networking version of General Purpose Finite Element Software integrated with CAD CFD |
500.00 |
100000.00 |
Publish |
2017-01-09 |
2017-01-27 |
408 |
708/1/S/EEC/WQAM/Furniture/2016/1157 dated 6/1/2017 |
Procurement of Godrej or equivalent furniture for WQAM Lab |
500.00 |
5000.00 |
Publish |
2017-01-06 |
2017-02-02 |
409 |
708/1/S/EEC/WQAM/Fuchamber/2016/1156 dated 6/1/2017 |
Tender for Installation and procurement of Fuming Chamber |
500.00 |
3500.00 |
Publish |
2017-01-06 |
2017-01-30 |
410 |
707/13/A/2016/1134 dated 3/1/2016 |
Providing and Supplying of service for upkeeping at Kandla Port Model |
500.00 |
5260.00 |
Publish |
2017-01-05 |
2017-01-17 |
411 |
708/1/EEC/GE/DSA/2016/1130 dated 02/01/2017 |
Tender Documents for Linear Electrical Resistance Weldable Strain Gauge |
500.00 |
5100.00 |
Publish |
2017-01-02 |
2017-01-25 |
412 |
708/1/S/EEC/HMC/2016/1034 |
Installing Testing and Commissioning of Variable Frequency Drive Starter |
575.00 |
4000.00 |
Publish |
2016-12-07 |
2016-12-30 |
413 |
708/1/S/EEC/LIB/SCAN/2016/1025 |
Establishment of Digital Library |
575.00 |
27280.00 |
Publish |
2016-12-02 |
2016-12-21 |
414 |
708/1/EEC/Hy Inst/2016/021 |
Bathemetry Survey at Barne reservoir MP |
575.00 |
31140.00 |
Publish |
2016-12-02 |
2016-12-26 |
415 |
708/1/EEC/Shy/wellog/2016/1026 |
Well Logging Software |
575.00 |
26000.00 |
Publish |
2016-12-02 |
2016-12-22 |
416 |
707/13A/2016/1020 |
Maintenance and upkeeping of CWPRS Guest House |
575.00 |
13019.00 |
Publish |
2016-11-30 |
2016-12-12 |
417 |
708/1/S/EEC/PH I/2016/1-1018 |
Upgradation and enhancement of mathematical computing facilities |
575.00 |
13860.00 |
Publish |
2016-11-30 |
2016-12-23 |
418 |
708/1/S/EEC/WQAM/2016/1390 dated 18/11/2016 |
Job Work for preparing Coloured copies of the Coffee Table Book |
575.00 |
3200.00 |
Publish |
2016-11-29 |
2016-12-16 |
419 |
708/1/EEC/CFI/PC/2016/982 dated 21/11/2016 |
Supply of Personal Computers |
575.00 |
15000.00 |
Publish |
2016-11-22 |
2016-12-14 |
420 |
708/1/S/EEC/HU/2016/960 |
Tender for taxi hiring Indigo and Innova AC or Non AC |
575.00 |
4000.00 |
Publish |
2016-11-17 |
2016-12-09 |
421 |
708/1/S/EEC/HU/2016/958 |
Procurement of Medicine and Surgical |
575.00 |
2400.00 |
Publish |
2016-11-16 |
2016-12-09 |
422 |
708/1/EEC/isHy/Flmeter/2016/1260 |
Laboratory Fluorometer 1 unit |
575.00 |
30000.00 |
Publish |
2016-10-27 |
2016-11-18 |
423 |
708/1/EEC/ScB/A3MFP/2016/1261 |
Procurement of A3 size Digital Multi Functional Printer 4 Nos |
575.00 |
6800.00 |
Publish |
2016-10-27 |
2016-11-21 |
424 |
708/1/EEC/RSA/Batteries/2016/903 |
Supply and Installation of Sealed Maintenance Free Batteris for two 7point 5 KVA UPS Systems |
575.00 |
2700.00 |
Publish |
2016-10-24 |
2016-11-15 |
425 |
708/2/EEC/GE/Soil/2016/1231 |
Soil Laboratory Equipments |
575.00 |
12760.00 |
Publish |
2016-10-24 |
2016-11-11 |
426 |
707/13/A/2016/878 |
plastering and painting to KPT Model |
500.00 |
11669.00 |
Publish |
2016-10-13 |
2016-10-26 |
427 |
708/1/EEC/SMS/Software/2016/857 |
Procurement of 2D 3D FEM Software for Geotechnical Engg |
500.00 |
30000.00 |
Publish |
2016-10-10 |
2016-11-03 |
428 |
708/1/EEC/TEXI/2016/816 |
HIRING OF TOURIST TAXIES |
575.00 |
4000.00 |
Publish |
2016-09-23 |
2016-10-17 |
429 |
708/1/EEC/TRANS/2016/808 |
Annual Rate Contract For Transportation of Govt Equipment CWPRS |
575.00 |
7000.00 |
Publish |
2016-09-22 |
2016-10-14 |
430 |
708/1/EEC/GE/PESL/2016 |
Supply of water purifiers |
575.00 |
11100.00 |
Publish |
2016-09-22 |
2016-10-13 |
431 |
708/1/EEC/SED/2016/ |
Job work for Printing of technical memorandum on Studies carried out by CWPRS for Sardar Sarovar Project 300 copies |
575.00 |
3500.00 |
Publish |
2016-09-16 |
2016-09-23 |
432 |
708/1/EEC/HIGPS/2016 |
Tender intimation for Procurement of Hand Held GPS for Bathymetry Surveying Work |
500.00 |
2200.00 |
Publish |
2016-09-15 |
2016-10-07 |
433 |
707/13/A/2016/916 dated 01/09/2016 |
Job work of commissioning of AC Shamiana |
500.00 |
50000.00 |
Publish |
2016-09-09 |
2016-09-14 |
434 |
708/1/S/EEC/PH II/2016/477 dated 09/09/2016 |
Job Work of Design and Fabrication of Mementos |
500.00 |
6000.00 |
Publish |
2016-09-09 |
2016-09-19 |
435 |
707/13/A/2016/917/455 dated 07/09/2016 |
Providing Services of Unskilled and skilled workers at CWPRS Pune |
500.00 |
99258.00 |
Publish |
2016-09-08 |
2016-09-26 |
436 |
707/13/A/2016/454 dated 07/09/2016 |
Renovation work in PH II |
500.00 |
12485.00 |
Publish |
2016-09-08 |
2016-09-26 |
437 |
707/13/A/2016/916 |
Job work for erection and commissioning of AC shamiana and Pendal for CWPRS centenary celebration 2016 |
500.00 |
50000.00 |
Publish |
2016-09-02 |
2016-09-08 |
438 |
707/13/A/2016/387 |
Renovation of Roof Top Rain Water Harvesting and minor civil works |
500.00 |
4856.00 |
Publish |
2016-08-10 |
2016-08-23 |
439 |
708/1/EEC/LIB/Bscan/2016/390 dated 09/08/2016 |
Procurement of hardware and software for digital library |
500.00 |
28000.00 |
Publish |
2016-08-10 |
2016-08-26 |
440 |
707/13/A/2016/387 |
Renovation of inco hall with minor civil works and plumbing works in CERC and CDC |
500.00 |
16553.00 |
Publish |
2016-08-10 |
2016-08-23 |
441 |
708/2/EEC/GP/BDP/2016/761 dated 5/8/2016 |
Tender Documents for Supply and commissioning of Borehole Probe |
500.00 |
22100.00 |
Publish |
2016-08-08 |
2016-08-26 |
442 |
707/13/A/2016/359 |
Tender for Internal and external painting |
500.00 |
450214.00 |
Publish |
2016-07-29 |
2016-08-05 |
443 |
708/1/EEC/Trans/2016/ |
ANNUAL RATE CONTRACT FOR TRANSPORTATION OF GOVT EQUIPMENTS UPTO 3 TONNES |
500.00 |
7000.00 |
Publish |
2016-07-28 |
2016-08-11 |
444 |
708/1/EEC/AEEC2016/367 |
Tender Intimation for Procurement of Cement on Rate Contract basis |
500.00 |
2100.00 |
Publish |
2016-07-27 |
2016-08-17 |
445 |
708/a/EEC/AEEC/2016/366 |
Tender Intimation for Procurement of Xerox Paper on Rate Contract basis |
500.00 |
3200.00 |
Publish |
2016-07-27 |
2016-08-17 |
446 |
708/1/EEC/RSWG/2016/358 |
Job Work of Super Cleaning of Hyd Oil of RSGW |
500.00 |
3000.00 |
Publish |
2016-07-27 |
2016-08-18 |
447 |
707/13/A/2016/350 |
Construction of Dust Bins and Repair painting of canal automation office and laboratory and mosquito control at CWPRS |
500.00 |
9513.00 |
Publish |
2016-07-26 |
2016-08-02 |
448 |
708/1/EEC/2016/357 |
Hiring Taxi for Director |
500.00 |
10000.00 |
Publish |
2016-07-22 |
2016-08-19 |
449 |
708/1/EEC/GEII/soil/PESL/16/334 dated 19/07/2016 |
supply of soil lab equipments |
500.00 |
4290.00 |
Publish |
2016-07-19 |
2016-08-12 |
450 |
707/13/A/2016/284 |
Construction of Model tray Painting work and NHP work |
123000.00 |
6144551.00 |
Publish |
2016-07-13 |
2016-07-26 |
451 |
708/1/S/EEC/WQAM/2016/264 |
job work for Coffee Table Book of centenary |
500.00 |
9000.00 |
Publish |
2016-07-01 |
2016-07-15 |
452 |
707/13/A/2016/238 |
Renovation Multiple 4 Different Works |
2467.00 |
123359.00 |
Publish |
2016-06-24 |
2016-07-05 |
453 |
707/13/A/2016/202 |
River sand Toilets work and Model Tray work |
500.00 |
46444.00 |
Publish |
2016-06-12 |
2016-06-17 |
454 |
707/13/A/2016 |
Installation of Name Boards in CWPRS |
500.00 |
3621.00 |
Publish |
2016-06-07 |
2016-06-09 |
455 |
708/1/S/EEC/WQAM/2016 |
document Coffee Table Book concept and design |
500.00 |
9000.00 |
Publish |
2016-06-03 |
2016-06-07 |
456 |
CWPRS/EECIVIL/TRANSPORT/RC |
TRANSPORTATION RATE CONTRACT |
500.00 |
7000.00 |
Publish |
2016-05-26 |
2016-06-20 |
457 |
EE/707/13/A/2016/139 |
repair shed office renovation |
500.00 |
43481.00 |
Publish |
2016-05-17 |
2016-05-30 |
458 |
EE/707/13/A/2016/140 |
trf pedstl toilt const model const |
500.00 |
17921.00 |
Publish |
2016-05-17 |
2016-05-31 |
459 |
EE/707/13/A/2016/139 |
repair shed office renovation |
500.00 |
43481.00 |
Publish |
2016-05-17 |
2016-05-30 |
460 |
708/1/EEC/WCS/PCDAS/16 |
PC Based Data Acq Sys |
500.00 |
10000.00 |
Publish |
2016-05-03 |
2016-05-20 |
461 |
708/1/EEC/Elect/2016/52 |
job work 70kva |
500.00 |
2555.00 |
Publish |
2016-04-25 |
2016-05-19 |
462 |
708/1/EEC/TRANS/2016/1126 |
ARC FOR TRANSPORTATION OF GOVT EQUIMENTS |
500.00 |
7000.00 |
Publish |
2016-03-29 |
2016-04-22 |
463 |
civil works |
civil works |
500.00 |
0.00 |
Publish |
2016-03-16 |
2016-03-30 |
464 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2016-02-24 |
2016-03-09 |
465 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2016-02-11 |
2016-02-23 |
466 |
Branded foam mattress |
Branded foam mattress |
500.00 |
6000.00 |
Publish |
2016-02-10 |
2016-02-25 |
467 |
Jobwork of supply installation and commissioning of electronic consolidation apparatus |
Jobwork of supply installation and commissioning of electronic consolidation apparatus |
500.00 |
11000.00 |
Publish |
2016-02-04 |
2016-02-26 |
468 |
2D and 3D FEM software for geotechnical engineering |
2D and 3D FEM software for geotechnical engineering |
500.00 |
18900.00 |
Publish |
2016-02-03 |
2016-02-22 |
469 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2016-01-29 |
2016-02-10 |
470 |
Tensile testing machine for geotextile |
Tensile testing machine for geotextile |
500.00 |
70000.00 |
Publish |
2016-01-29 |
2016-02-15 |
471 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2016-01-07 |
2016-01-19 |
472 |
Supply Installation and Commissioning of PC based Data acquisition system |
Supply Installation and Commissioning of PC based Data acquisition system |
500.00 |
10000.00 |
Publish |
2015-12-18 |
2016-01-04 |
473 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2015-12-18 |
2015-12-30 |
474 |
708/2/EE-C/GE/DSA/2015 |
Direct Shear Apparatus |
500.00 |
28000.00 |
Publish |
2015-12-08 |
2015-12-28 |
475 |
707/13/A/2015/726 |
CIVIL WORK |
500.00 |
0.00 |
Publish |
2015-12-04 |
2015-12-22 |
476 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2015-12-03 |
2015-12-08 |
477 |
Civil Works |
Civil Works |
500.00 |
0.00 |
Publish |
2015-11-17 |
2015-12-01 |
478 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2015-10-20 |
2015-10-27 |
479 |
RSWG |
RSWG |
500.00 |
8121.00 |
Publish |
2015-10-12 |
2015-11-02 |
480 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2015-09-09 |
2015-09-16 |
481 |
Civil works |
Civil works |
500.00 |
0.00 |
Publish |
2015-09-09 |
2015-09-14 |
482 |
Stationery |
Stationery |
500.00 |
4000.00 |
Publish |
2015-09-01 |
2015-09-21 |
483 |
Civil Works |
Civil Works |
500.00 |
0.00 |
Publish |
2015-08-04 |
2015-08-18 |
484 |
CAMECORDER |
HD Camcorder Video Camera alongwith Accessories |
500.00 |
9040.00 |
Publish |
2015-07-02 |
2015-07-17 |
485 |
CIVIL WORK |
CIVIL WORK |
500.00 |
1.00 |
Publish |
2015-06-30 |
2015-07-13 |